Tonan Asia (Bangna BKK) 2022-present
Electrical engineer
-Solar cell project
Big-C samutsakhon (2023)
-onsite oversee and support technician.
-support QC team for inspection cable and equipment make report.
-De-connect and connect for strap on CT High volt
Thai namthip huamark (2024)
-onsite oversee and support technician.
-support QC team for inspection cable and equipment make report.
-De-connect and connect for strap on CT High volt
Lampang residence (2024)
-wiring LCB/measurement equipment for installation
bangkok residence (2025)
ban charan soi13 10kW
punya village 10kW
bangkok residence (2026)
ban phaya-thai 8kW and new design electrical system
-Construction project
Thai mitsui (2024)
-meeting work plan installation untill shutdown for tie-in piping until commissioning completed
-drawing typical installation, cable schedule, wiring diagram, single line diagram
TAO (2024)
-support make some drawing electrical part
-onsite management electrical tech
-Engineering and Drawing project
Thai jurong power plant project (2024-2025)
-weekly meeting to update progress of work
-prepare drawing SLD/ Cable schedule /Cable cal report/Routing cable
VASMO Assia industrial estate rayong (2026)
-dwg single line diagram ref from my senior and recheck calculation cable.
-cable schedule recalculation before single line diagram process.
-route cable line/pipe rack route to equipment/calculation cable tray ladder
กรกฎาคม 2564 ถึง สิงหาคม 2565
E&I engineer
Tesco engineer
190 ม.3 ต.ลานกระบือ อ.ลานกระบือ จ.กำแพงเพชร 62710
สำหรับสมาชิกเท่านั้น
tesco engineers (Lankrabue kampaengphet) 2020-2022
E&I technician
scope of work
Site E-Echo Lan krabue
-cable laying installation cable gland and cable connect to Transformer
-wiring cable and check connect cable prepare for commissioning
Site L (EOR Project)
-Recheck cable schedule from vendor and discuss for cable laying
-Recheck cable drum/ cut lenght
-Support vendor EOR prepare for commissioning
E&I engineer
LKU-L
-Prepare documents requesting permit to enter the area
-On site for management scope of work on schedule
-Recheck connect cable schedule / cable connect prepare for pre-commissioning.
-Support vendor Pump check vibration, no load test,load test
-Commissioning project plant
LKU-E
-Prepare documents requesting permit to enter the area
-On site for management scope of work on schedule
-Recheck connect cable schedule / cable connect prepare for pre-commissioning.
-Support vendor Pump check vibration, no load test,load test
-Commissioning project plant
Shutdown commissioning
-Prepare documnets planing scope of work for operation accept permit.
-Meeting electrical team, management technician for work
-creat summary report after commisioning is completed