Highway construction project from Asian Development Bank.
สิงหาคม 2564 ถึง มิถุนายน 2567
Project control Engineer
Rithwik Projects Private Limited
Uttarakhand, INDIA
สำหรับสมาชิกเท่านั้น
Construction of Single Line BG Tunnel no. 11
(9050m), Major & Minor Bridges, Formation works (FLS) under Package-6
in connection with new BG Line between Rishikesh & Karnaprayag (125
Km) in the state of Uttarakhand ,INDIA.
Roles & Responsibilities:
Tunnel construction work with good for construction
drawings.
Cycle-time preparation to calculate and mitigate delays.
Underground excavation of tunnels by NED blasting in
hardrock and multi drift method in loose soil.
Reinforced concrete lining of tunnels.
Multi stage concrete slabs casting below railway track.
Bar Bending Schedule
WBS at Primavera P6 for project scheduling.
Delay analysis and reconciliation
มิถุนายน 2567 ถึง มีนาคม 2568
Tunnel Engineer
Consulting Engineers Group (CEG)
Mumbai
สำหรับสมาชิกเท่านั้น
Construction of Tunnelling Works including
Testing and Commissioning for Double Line High Speed Railway using
Tunnel Boring Machine (TBM) and New Austrian Tunnelling Method
(NATM) in mumbai. Construction of Mumbai Ahmedabad High Speed Rail
(Package No. MAHSR - C-2).
Roles & Responsibilities:
Site supervision following Japanese standards codes.
Utilization report to track progress as per planned.
Underground excavation of tunnels by NED blasting.
Traction Sub-station development for electrical supply.
CAD drawings inspection as per executed quantities.
Request for Inspection (RFI) fixtures.
Currently I'm working as a Project Engineer in Design and construction of Tertiary Treated Water
Conveyance Tunnel in Mumbai from Ghatkopar WWTF to Bhandup
WWTF up to Bhandup Complex.
Roles & Responsibilities:
Site supervision of construction activities according to
drawings.
Secant Piling, Shaft excavation & support, TBM operations
Rolling plan for upcoming activities via. project program
in Microsoft Projects and monthly tracking.
Project’s risk assessment to avoid hazards and delays