Optimized production processes, Reduced cycle time, Conducted time studies, Improved line balancing, Maximized productivity.
- Minimized NG parts, Reduced rework rate, Conducted root cause analysis, Implemented corrective and preventive actions (CAPA).
- Eliminated manufacturing wastes (MUDA), Applied Lean/Six Sigma methodologies, Facilitated 5S activities, Streamlined workflows.
- Achieved a 10.5% headcount reduction (from 285 to 255 workers) by redesigning line balance (LOB) via ECRS principles and deploying automated manufacturing solutions.
- Analyzed production defects and quality issues using 5 Whys and Fishbone methodologies to determine root causes and implement effective corrective actions to minimize scrap.
- Reviewed and updated standard operating procedures (SOPs) and PFMEA documents to identify potential process failures and mitigate manufacturing risks.
- Conducted technical training for production staff on updated process standards and quality protocols to ensure strict compliance on the shop floor.
เมษายน 2567 ถึง พฤศจิกายน 2568
Jr.Engineer
HIRAISEIMITSU (Thailand) Co., Ltd
600/37 ถนนสุขาภิบาล 8 อำเภอศรีราชา จังหวัดชลบุรี
สำหรับสมาชิกเท่านั้น
In charge of pre-production for new pad printing screen
• Analyze and optimize production processes to increase productivity and reduce cycle time.
• Cooperate with related section such as Production,QC ,for the perfect work
• Tooling and Equipment make and modify
• Ensure product quality aligns with company standards and customer specifications
• Supervise and train production staff on standard operating procedures (SOP) and safety protocols.
• Prepare production reports and KPI to present to management