ปริญญาตรี Rajamangala university of technology thanyaburi
คอบ.
วิศวกรรมเครื่องกล
2.92
ประวัติการทำงาน
0 ปี
ไม่ได้ระบุ
Assistant factory manager /maintanance manager
Inno cons (thailand)
Pathum thani
สำหรับสมาชิกเท่านั้น
Quality Management
• Managed and maintained the ISO 9001:2015 Quality Management System
• Analyzed product quality issues and customer claims, including root cause analysis and corrective actions
• Participated in establishing new production processes and new product development, including preparation of FMEA and Control Plans
• Controlled and implemented waste reduction initiatives within production processes
• Prepared documentation and supporting data for Carbon Footprint certification
• Developed and implemented Process Safety Management (PSM) systems for manufacturing operations
Preventive Maintenance
• Planned and managed machine preventive maintenance systems
• Monitored and controlled maintenance activities including PM, BM, and CM programs
• Developed downtime KPI systems and improvement plans to control MTBF and MTTR performance
• Prepared machine availability reports and monitored equipment readiness
• Measured and analyzed machine performance efficiency (OEE) in alignment with production cost targets
Process Improvement
• Designed machine parts and supporting equipment to reduce production losses using Lean Manufacturing concepts
• Led continuous improvement projects to encourage employee participation based on Kaizen methodology
ไม่ได้ระบุ
Maintanance engineer
General hospital product(GHP)
Pathum thani
สำหรับสมาชิกเท่านั้น
Preventive Maintenance
• Planned and managed machine preventive maintenance systems
• Monitored and controlled maintenance activities including PM, BM, and CM programs
• Developed downtime KPI systems and improvement plans to control MTBF and MTTR performance
• Prepared machine availability reports and monitored equipment readiness
Vacuum System Improvement Project
• Led a vacuum system improvement project by converting the existing Oil Type vacuum system to a Water Ring Vacuum Pump system to improve operational efficiency and reduce operating costs
• Conducted investment feasibility and ROI analysis for the project implementation
• Reduced energy consumption, maintenance costs, and oil contamination risks in the production process