1. Coordinated with the contractor and architect
2. Specified door hardware set to comply with the specification requirements/ standards (ANSI, EN, etc.)
and based on the function in specific areas
3. Presented the products with the clients
1. Designed subway station and coordinated with the
engineering team (structural, EE, mechanical, fire
engineers, etc.)
2. Prepared drawings during the detail design and CRD
stage
1. Reviewed and combined technical specifications for
the architectural shop drawing
2. Verified construction documentation to ensure it
conformed to quality assurance standards and
client requirements
3. Consistently adhered to schedule because of
planning skills and expert coordination
4. Approved method and architectural material
5. Carefully double checked every order to ensure
correct quantity and material cost
6. Co-ordinated with sub-contractors, the consultant,
designers, and the owner
7. Inspected and facilitated the residential handover
process ess directly with clients
8. As the main contractor, I reviewed and combined
drawings such as MEP, interior and architectural