Receive and inspection material.
Prepare WPS, PQR following project spec requirement.
Check welder qualification and validity.
Review drawing and update revision.
Control percentage of NDT following project spec requirement.
Witness and review NDT process following project spec requirement.
Review dimension report and as-built drawing.
Monitor pressure test.
Prepare and review inspection report.
ธันวาคม 2565 ถึง สิงหาคม 2567
Mechanical Engineer
อิตัลไทยวิศวกรรม
กรุงเทพมหานคร
สำหรับสมาชิกเท่านั้น
Receive and inspection material.
Prepare WPS, PQR following project spec requirement.
Control the amount of manpower to be fit for work and duration.
Perform fit-up and visual inspection in accordance with code.
Inspection dimension during fabrication.
Check welder qualification and validity.
Review drawing and update revision.
Prepare and review weld map for piping.
Control percentage of NDT following project spec requirement.
Witness and review NDT process following project spec requirement.
Review dimension report and as-built drawing.
Prepare and review welding history sheet report.
Monitor pressure test of piping.
Inspection equipment installation.
Prepare and review MDR.
พฤษภาคม 2564 ถึง พฤศจิกายน 2565
QC Engineer
บุณยนุช เอนจิเนียริ่ง
อ.เมือง จ.ระยอง
สำหรับสมาชิกเท่านั้น
Control of QC & QA Processes Work to site.
ASME : U and R Stamp.
Quality Control of Work to According Standards.
Prepare WPS, PQR following project spec requirement.
Prepare Welder or Welding Operator Performance for project.
Visual inspection in accordance with code.
Monitor welding sequence.
Check welder qualification and validity.
Review drawing and update revision.
Prepare and review weld map.
Control NDE and witness.
Prepare and review welding history sheet report.
Monitor pressure test.
Prepare and review MDR.