: Stadium Hall (46Mx 46M Steel Structure Building)
Duties and Responsibilities
• Prepared cost estimates based on technical specifications, shop drawings, and other documentation for both
pre-contract and post-contract stages.
• Liaised and assessed quotations from suppliers and sub-contractors to achieve cost saving opportunities.
• Managed variation orders, payment processes, and final account preparation.
• Collaborated closely with Site Engineer and project teams to ensure timely and within-budget project.
• Provided comprehensive cost reports and updates to client, contributing to a 98% client satisfaction rate and
securing repeat work.
มีนาคม 2564 ถึง พฤศจิกายน 2566
Quantity Surveyor
Nang Grin Construction Co. Ltd
Myanmar
สำหรับสมาชิกเท่านั้น
of Quantity (BOQs) based on project designs and specifications.
• Prepared tender documents, cost estimations and time scales for materials and labors.
• Control project costs to ensure alignment with the approved budget.
• Managed progress claims and variation orders, ensuring compliance with contractual terms.
• Collaborated with subcontractors and project teams to ensure cost effective solutions and value
engineering.
• Conducted through site inspections and measurements to accurately assess project costs.
• Submitted monthly cash flow forecasts and financial reports to project manager.
• Assisted in the settlement of accounts with client, suppliers and subcontractors.
• Developed shop drawings detail drawings, ensuring accuracy and completeness for submission.
• Accurately estimated project budgets for 20+ residential construction projects, ensuring all projects were
completed within budget.
ธันวาคม 2562 ถึง มกราคม 2564
Site Engineer
Kan Htoo Manaw Construction Co. Ltd
Myanmar
สำหรับสมาชิกเท่านั้น
• Assisted the activities of road project, ensuring all works are carried out as per drawings, plans, and specifications.
• Supervised the construction of four box culverts, including excavation, formwork, reinforcement concrete work and finishing works.
• Monitored the use of materials, equipment and labour to remain the project within budget.
• Liaised with local authorities, and rural communities as necessary to ensure progress of the project.
• Implemented four box culverts, ensuring all technical specifications and safety standards were met within the set timeline and budget.
ประวัติการฝึกอบรม
พฤศจิกายน 2568 ถึง ธันวาคม 2567
Q Sandra
Quantity Surveying and Contract Management Course
มีนาคม 2566 ถึง ธันวาคม 2565
SQS Training Center
Quantity Surveying Course
มกราคม 2565 ถึง สิงหาคม 2565
DYYH Training Center
QS Steel Structure intermediate and advanced Course
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (พอใช้) เขียน (พอใช้)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
พูด (ดี) อ่าน (ดีมาก) เขียน (ดีมาก)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Project: Stadium Hall (46Mx 46M Steel Structure Building)