Issued the structure drawing to Fabricator in Thailand.
Review design from customer/owner for create RFI, create
schedule planning to team, and support the other
college if any required assistance to create another model.
Checked GA Drawing, Assembly Drawing and Fitting Drawing on
My Team
Prepared MTO for estimate cost new job.
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Created the template report, template GA drawing assembly drawing and single part drawing.
เมษายน 2565 ถึง กรกฎาคม 2565
Senior Structure Designer Level 2
Aibel (Thailand) Ltd.
rayong
สำหรับสมาชิกเท่านั้น
Shop designer.
มิถุนายน 2560 ถึง มิถุนายน 2564
Project Leader
GT Creations Ltd.
Krungthep
สำหรับสมาชิกเท่านั้น
Issued the structure drawing to Fabricator in United State.
Coordinate with Mike Owen Fabricator, Ahlborn Fabricator, Anvil
& Junior Steel Fabricator, Coast Iron Fabricator, Dupont Fabricator,
Gibson Fabricator, ReddIron Fabricator, Richardson Steel
Fabricator, S&G Fabricator, Schuff Fabricator,
Issued the structure drawing to Fabricator Australia. Struc-tech
Fabricator.
Review design from customer/owner for create RFI, create
schedule planning to customer/owner, and support the other
college if any required assistance to create another model.
Finalize all Fabricator details and standard reference with latest
AISC. Structure Design, Architectural Design and Mechanical
design.
Create 3D Model for fabrication assembly shop drawing such as
Module, Anchor bolt, Steel, Stair, Ladder, Handrail, Support
opening and Support MECH.
Make a Drawing GA (General Arrangement) and Isometric
Drawing.
Create 2D Drawing for Fabricator
Make a Fitting Drawing for Fabricator
Checked GA Drawing, Assembly Drawing and Fitting Drawing on
My Team
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Compare new design (Next Revisions) with Latest design for
Create Man hour Revise Model.
Make a schedule planning with maintain a revision of design.
CB&I Storage Solutions (Thailand) Ltd.
Principal Structure Designer
Feb 15, 2024 – Jun 05, 2004
Project: Construction for Thailand.
Issued the structure drawing to Fabricator in Thailand.
Review design from customer/owner for create RFI, create
schedule planning to team, and support the other
college if any required assistance to create another model.
Checked GA Drawing, Assembly Drawing and Fitting Drawing on
My Team
Prepared MTO for estimate cost new job.
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Created the template report, template GA drawing assembly drawing and single part drawing.
Freelance Drafter
Feb 2023 – May 2023
Project: Construction for Thai oil Project.
Issued the structure drawing to Fabricator Sarcon
Review design from customer/owner for create RFI, create
schedule planning to consulted customer/owner.
Make a Drawing GA (General Arrangement) and Isometric
Drawing.
Create 2D Drawing for Fabricator
Thaiwater Engineering Co, Ltd.
Project Engineer
Oct 1, 2022 – Dec 29,2022
Project: Construction for Canada.
Issued the structure drawing to Fabricator in Canada.
Review design from customer/owner for create RFI, create
schedule planning to customer/owner, and support the other
college if any required assistance to create another model.
Finalize all Fabricator details and standard reference with latest
AISC. Structure Design, Architectural Design and Mechanical
design.
Create 3D Model for fabrication assembly shop drawing such as
Module, Anchor bolt, Steel, Stair, Ladder, Handrail, Support
opening and Support MECH.
Make a Drawing GA (General Arrangement) and Isometric
Drawing.
Create 2D Drawing for Fabricator
Make a Fitting Drawing for Fabricator
Checked GA Drawing, Assembly Drawing and Fitting Drawing on
My Team
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Compare new design (Next Revisions) with Latest design for
Create Man hour Revise Model.
Make a schedule planning with maintain a revision of design.
Aibel (Thailand) Ltd.
Senior Structure Designer Level 2
Apr 2022 – July 2022
Project: Construction for Bacalhau FPSO Project.
Shop designer.
Freelance Drafter
July 2021 – Mar 2022
Project: Construction for Golden pass LNG (GPX) Project.
Issued the structure drawing to Fabricator STP&I
Review design from customer/owner for create RFI, create
schedule planning to consulted customer/owner.
Finalize all Fabricator details and standard reference with latest
AISC.
Create 3D Model for fabrication assembly shop drawing such as
Module, Anchor bolt, Steel, Stair, Ladder, Handrail, Support
opening and Support MECH.
Make a Drawing GA (General Arrangement) and Isometric
Drawing.
Create 2D Drawing for Fabricator
Fitting Drawing for Fabricator
Checked and validated GA Drawing, Assembly Drawing and
Fitting Drawing on My Team
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Compare new design (Next Revisions) with Latest design for
Create Man hour Revise Model.
Make a schedule planning with maintain a revision of design.
GT Creations Ltd.
Project Leader
June 2017 – June 2021
Project: Construction for Australia, United State.
Issued the structure drawing to Fabricator in United State.
Coordinate with Mike Owen Fabricator, Ahlborn Fabricator, Anvil
& Junior Steel Fabricator, Coast Iron Fabricator, Dupont Fabricator,
Gibson Fabricator, ReddIron Fabricator, Richardson Steel
Fabricator, S&G Fabricator, Schuff Fabricator,
Issued the structure drawing to Fabricator Australia. Struc-tech
Fabricator.
Review design from customer/owner for create RFI, create
schedule planning to customer/owner, and support the other
college if any required assistance to create another model.
Finalize all Fabricator details and standard reference with latest
AISC. Structure Design, Architectural Design and Mechanical
design.
Create 3D Model for fabrication assembly shop drawing such as
Module, Anchor bolt, Steel, Stair, Ladder, Handrail, Support
opening and Support MECH.
Make a Drawing GA (General Arrangement) and Isometric
Drawing.
Create 2D Drawing for Fabricator
Make a Fitting Drawing for Fabricator
Checked GA Drawing, Assembly Drawing and Fitting Drawing on
My Team
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Compare new design (Next Revisions) with Latest design for
Create Man hour Revise Model.
Make a schedule planning with maintain a revision of design.
Freelance Draft man
January 2016 – March 2017
Project: Trinity Dynamic Corporation Co., Ltd Plant
Client: Trinity Dynamic Corporation Co., Ltd
Create 3D Model for Fabrication Assembly Shop Drawing such as
Warehouse Plant, Foundation, Stair, and Canopy.
Make a Drawing GA (General Arrangement) and Isometric
Drawing.
Prepared of Material, Report weight, Consumable.
Prepared Bill of Materials (BOM), Product Specification Sheets.
Coordinate with Production to build and fabricate
Develop & revised a drawing reference to install on sited.
GT Creations Ltd.
Draft man
October 2014 –November 2015
Project: Construction for Australia, US.
Issued a drawing to Fabricator US. Mike Owen Fabricator, Ahlborn
Fabricator, Anvil & Junior Steel Fabricator, Coast Iron Fabricator,
Dupont Fabricator, Gibson Fabricator, ReddIron Fabricator,
Richardson Steel Fabricator, S&G Fabricator, Schuff Fabricator,
Issued a drawing to Fabricator Australia. Struc-tech Fabricator.
Review design from owner for create RFI, Create schedule to
owner, and support the other college if any required assistance to
create another model.
Finalize all Fabricator Details and Standard Reference with Latest
AISC.
Create 3D Model for Fabrication Assembly Shop Drawing such as
Module, Anchor bolt, Steel, Stair, Ladder, Handrail, Support
opening, and Support MECH.
Drawing GA (General Arrangement) and Isometric Drawing.
Create 2D Drawing for Fabricator
Fitting Drawing for Fabricator
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Compare new design (Next Revisions) with Latest design for
Create Man hour Revise Model.
Make a schedule planning with maintain a revision of design.
A-TEC THAI ENGINEERING CO.LTD
Draft man
July 2014 – September 2014
Project: Q-BIC Plant
Client: Q-BIC
Create 3D Model for Fabrication Assembly Shop Drawing such as
Module, Foundation, Stair, and Handrail.
Drawing GA (General Arrangement) and Isometric Drawing.
Prepared of Material, Report weight, Consumable.
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Develop & Revised Drawing Reference to install on sited
Coordinate with Production to build and fabricate
CUEL Co.,Ltd.
Draft man
July 2013 – June 2014
Project: IPEX Ichithys Onshore LNG Facilities
Client: JCK AUSTRALIA LNG PTY LTD
Create 3D Model for Fabrication Assembly Shop Drawing such as
Module, Stair, Ladder, Handrail, Grating.
Drawing GA (General Arrangement) and Isometric Drawing.
Prepared of Material, Report weight,
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Develop & Revised Drawing Reference to install on sited.
Prepared drawing a weld history, weld map for Fabrication.
Eurotech International Ltd.
Draft man
June 2010 – June 2013
Project: Macedon Gas Plant Project, Gorgon Project, LYNWOOD Project,
ENSENADA DE BARRAGAN CC POWER Plant Project, ETC.
Client: Chevron Group
Create 3D Model for Fabrication Assembly Shop Drawing such as
Module, Stair, Ladder, Handrail, Grating, and Frame Etc.
Drawing GA (General Arrangement) and Isometric Drawing.
Prepared of Material, Report weight, Consumable.
Assembly Shop Drawing Referenced Design Drawing form Client.
Develop & Revised Fabrication Drawing.
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Freelance
June 2009 – May 2010
Project: Macedon Gas Plant Project
Client: Chevron Group
Meeting with The Customer to Clear Drafting Scope and
specification to set up
Create 3D Model for Fabrication Assembly Shop Drawing such as
Stair, Conveyers, Cabinet, Grating.
Drawing GA (General Arrangement) and Isometric Drawing.
Prepared of Material, Report weight, Consumable.
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Coordinate with Production to build and fabricate
Follow up the customer satisfaction
Develop & Revised Drawing Reference to Install on Sited.
DP Advance Chonburi Co, Ltd
Cad Designer
February 2006 - MAY 2009
Meeting with The Customer to Clear Drafting Scope and
specification to set up
Create 3D Model for Fabrication Assembly Shop Drawing such as
Stair, Conveyers, Cabinet, Grating.
Drawing GA (General Arrangement) and Isometric Drawing.
Prepared of Material, Report weight, Consumable.
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Coordinate with Production to build and fabricate
Follow up the customer satisfaction
Drawing GA (General Arrangement) and Isometric Drawing.
Prepared of Material, Report weight, Consumable.
Prepared Bill of Materials (BOM), Product Specification Sheets and
Quality Assurance Documents.
Develop & Revised Drawing Reference to Install on Sited.