•Prepared the Shop Drawing as assigned, utilizing BIM software (Tekla Structures) to create 3D model that integrates with both architectural and E&M works. Additionally, AutoCAD was used for the drawing preparation.
•Prepared material quantities for the main structure, including the amount of reinforcing steel, bar-cut list, and concrete volume.
•Calculated and redesigned the structure to ensure it aligns with the actual site conditions. Additionally, updated the drawings for approval from the project owner before proceeding with construction.
•Collaborated with the project consultants to explain and resolve issues.
•Plan and control the work to ensure it aligns with the construction schedule.
กรกฎาคม 2562 ถึง เมษายน 2564
วิศวกรประมาณราคา
EMC PLC.
ITF TOWER, 28/30 FLOOR, 140/66-67 SILN ROAD SURIYAWONG, BANG RAK Bangkok10500
สำหรับสมาชิกเท่านั้น
•Quantities Take-off and rechecked quantity to match the drawing.
•Estimated the construction cost and Structure work.
•Value engineering.