- Project Design-Construction and Qualifications and Change Control for New Project Work and Renovation Work
- Planning & Scheduling for Preventive Maintenance and Operating Utilities System Such as
HVAC & Cleanroom System
Compressed Dry Air System
Purified Water System
Fire Protection System
Waste Water Treatment Plant
Sanitary System
Dust Extraction System
Wet Scrubber System
Electrical System.
And Production Machine Such as High Speed Mixer, Bin Blender Mixer, Pin Mill, Filling Machine, Packing Machine
- Preparation Maintenance Report Such as BD Time, MTTR, MTBF
- Preparation Inventory Spare Part Reduction and Optimization By ABC Analysis and MRP
- Preparation for BEM&BQM Betagro Standard and BMMS Program.
- Preparation for Standard Operation of Procedure Document (SOP).
- Implement World Class Manufacturing (WCM), QCC, KSS Award, 8Pillars, 4QOL
- Quality Audit Control System
- TPM Cost Down Planning and Forecast Budgets
- Project detail design.
- Planning & Scheduling
- Site Supervision Equipment & Instrument Installation and Test run Including Training for Commissioning Protocol
- Preparation Operation & Maintenance Manual for Preventive Maintenance
- Project: Upgrading of an existing Waste Water Facility From Capacity 2500m3/day to 4000m3/day of Biological Treatment Plant.
Client: Better Food Co.,Ltd ,Samutsakorn
Project Value: 20 Million Baht
- Project: Waste Water of Biological Treatment Plant Capacity 3000m3/day.
Client: Betagro Group ,Lopburi
Project Value: 35 Million Baht
สิงหาคม 2543 ถึง พฤษภาคม 2545
Service Engineer
Jienmy Engineering Ltd.
สุขุมวิท22 กรุงเทพ
สำหรับสมาชิกเท่านั้น
- Installation and Test run Commissioning including Training Operation and Maintenance
- Service and Consultant.
Such As
• HDPE Inflation Machine
• Weaver Machine
• Knitting Machine
• Wiring Machine
• Inverter, Motor and Soft Start
-Designed, Construction and Commissioning Various Project Participated
Such As
2014-2016 HVAC For Cleanroom GMP-PICS Project, Betterpharma Lopburi, Thailand
2013 Cleansing & Warehouse Project, Betterpharma Lopburi, Thailand
2012 Human Cleansing Project, Betterpharma Lopburi, Thailand
2010 HVAC for Production Line, Betagro MF Deli Lopburi, Thailand
2008 Biacid Line Project, Betterpharma Lopburi, Thailand
2007 Capcisin Line Project, Betterpharma Lopburi, Thailand