- Control and manage process of OD. 5.7 m. tunnel excavation from Shaft 1 (Ratchadaphisek
rd.) to Shaft 6 (Kiak Kai) ,Tunnel length 6.4 km and Depth 35 m.
- Control and manage lifting and assembly of TBM
- Control and manage maintenance of TBM
- Control and manage erector and segment supply system for internal election
- Control and manage soil conveyance system in the tunnel to surface
- Control and manage TBM dislocation
Mechanical Engineer of Leam Chabang Project, Port A, Chonburi
- Control and manage sanitary and electrical works of the project
- Control and manage maintenance of the project
- Control and manage air conditioner installation
มกราคม 2561 ถึง ธันวาคม 2562
Senior Mechanical Engineer of Tunnel
Sino-Thai Engineering & Construction Public Co.,Ltd.
- Control and manage process of OD. 5.7 m. tunnel excavation from Shaft 1 (Bueng-nong-bon) to
Shaft 10 (chaophya) ,Tunnel length 9.4 km and Depth 40 m.
- Control and manage lifting and assembly of TBM
- Control and manage maintenance of TBM
- Control and manage erector and segment supply system for internal election
- Control and manage soil conveyance system in the tunnel to surface
- Control and manage TBM dislocation