• Planning, coordinating and managing all phases of construction projects, including project initiation, planning, execution, monitoring and closeout.
• Establishing project objectives, scope and deliverables in collaboration with stakeholders and ensuring alignment with client requirements.
• Developing and managing project schedules, budgets and resource allocations to ensure cost efficiency and timely delivery.
• Communicates with clients and delivers project progress reports.
• Develops and adheres to the budget, timeline, and quality control plan.
• Collaborates with owner, engineers, electricians, and other specialists.
• Writes and submits testing and inspection logs, quality assurance reports, and punch lists.
• Ensures that all local, state, and national building codes and regulations and safety precautions are followed.
• Managing procurement processes, including bid evaluations, contract negotiations and vendor selection.
• Oversee project budgeting and cost control and manage change orders to ensure adherence to budgetary constraints.
• Conducting regular site inspections to assess project progress, identify risks, and ensure compliance with safety protocols and regulatory requirements.
สิงหาคม 2564 ถึง พฤษภาคม 2567
Production Manager
Sahaviriya steel
ฉะเชิงเทรา
สำหรับสมาชิกเท่านั้น
• PEB is a Pre-Engineered Building optimistic structure steel frame, Primary, Secondary and Roof steel structure
RESPONSIBLE :
• Weekly management meeting with general manager and project manager to communicate any key
dates or issues with production.
• Communicate ETAs and delays with customer's directly.
• Manage shop floor work centers to prevent bottlenecking, and boost production output by reducing downtime.
• Procure and maintain healthy levels of welding and fabrication consumables. Gas, Welding tips, grinding discs etc.
• Lead troubleshooting and problem solving activities in the operational area and involve with other parties concerned such as, Owner, QA/QC in timely and effectively manner.
• Structure steel production using CNC Machines, fabrication or directly related experience.
• Lead all aspects of the Shop including to managing personnel, production (Fabrication), Inventory, Shipments and deliveries.
• Monitor production output, supervise staff, and ensure that products meet customer specifications and quality expectations.
• Managing inventory, ordering materials, increasing the efficiency of operations and scheduling production
ไม่ได้ระบุ
Production Manager
AGON pacific
ระยอง
สำหรับสมาชิกเท่านั้น
Generate the cost estimates, budgets, and work timetables.
Manpower planning and manpower control according to existing jobs.
Develops and creates visual management tools to assist in monitoring KPI’s towards the overall
Corporate plan and continuous improvement.
Interpret and explain contracts and technical information to other professionals.
Generate the schedule, and sequence of work activities.
Monitoring and report work progress daily, weekly and monthly report and summary report.
Review NDT report and ITP with owner and third party for submit documents.
Complete standard service reports, invoicing packages, and other administrative requirements.
COMPANY POSITION
PLACE
PERIOD OF WORK PPOJECT
SERVICE TYPE
: THAI NIPPON STEEL ENGINEERING & SUMIKIN & CONTRUCTION : PIPING & MECHANICAL ENGINEER
: CHACHOENGSAO & SAMUTPRAKARN
: NOVEMBER 2011 – JUNE 2015
: PTTEP (BUNDLED PHASE PROJECT WELLHEAD PLATFORM 22 PLATFORM)
: PTTEP (LONG TERM PHASE I PROJECT WELLHEAD PLATFORM 11 PLATFORM)
: PTTEP (LONG TERM PHASE II PROJECT WELLHEAD PLATFORM 7 PLATFORM)
: OIL AND GAS, OFFSHORE & ONSHORE One stop service EPCIC Contractor (Engineering, Procurement, Construction, Installation and Commissioning)
: Fabrication&InstallationPipingandEquipmentinstallation RESPONSIBLE :
Providing status reports and communicating ongoing issues and plans with the project manager
Interpreting project specifications and scope of all engineering disciplines
Reviewing and approving designs and vendor drawings to ensure conformity with project.
Specifications, company practices and good engineering practice.
Developing a scope of work for a specific project deliverable (e.g., structure, instrument and electrical,
among others)
Coordinating development of construction work packages (CWP)
Preparing project plans (project execution plan, design basis memorandums, budgets, manpower, and
schedules) for engineering deliverables.
Ensuring plans, instructions, standards and work process are followed.
Review and monitoring work progress for improve productivity on Piping fabrication and Installation and ensure all subordinate and subcontractor member understanding Company quality policy and section objective.
To ensure that the resource for piping fabrication and Installation they are suitable and adequate to meet our requirement at each stage as per work schedule.(Drawing, Material , Manpower, Area etc.)
Control Equipment installation work of Gas Filter, Knock out drum, Close Drain Sump vessel, Pig Launcher and Pig Receiver and Close Drain sump pump on Platform.
Control for assembly and installation Equipment work of Crane platform and Booster Com presser.
Control work sequence of Crane platform and Booster Com presser to load test and function test on
site for inform to contractor.
Provide Piping & Equipment for fabrication and installation of manpower plan and efficiency for project as well.
Review and monitoring subordinate and subcontractor work safety at all time and ensure all of them understanding our HSE policy.
To studies work sequence and developing/improvement for higher productivity with low cost investments.
Engage and cooperate other disciplines (Structural, E&I, Planer, Engineering etc.) to ensure all concerned aware of the risks at the piping fabrication and installation works stage.
Monitor materials receiving and issue for fabrication and installation are correct and on time without effecting quality requirement and project schedule.
Monitor work performance check and approve work being executed, completed by supervisor/subordinate person.
Mark up on P&ID and preparation Check sheet, Test sheet, final document Piping Pressure Test Packages and related documentation.
Control schedule and sequence of work Line check, Flushing test, Line testing, System service test
Monitoring and provide Hydrostatic pressure test and flushing control following schedule plan.
Provide the valve testing on site (Ball valve, Glove valve, etc.) pressure rating test as follow rating pressure system service in line.
Ensure documents are originated, checked and approved by suitable competent personnel.
Examine drawings, specification and method statement to define and understand construction criteria.
Maintain Quality Records for inspection and test activities.
Review project documents and PR, PO report and ensure that received.
Planning to clear punch lists for target of work “0” punch list.
COMPANY POSITION
PLACE
PERIOD OF WORK SERVICE TYPE
: AMEC FOSTER WHEELER SERVICE (THAILAND) LIMITED : PRODUCTION ENGINEER
: RAYONG
: MAY 2008 – OCTOBER 2011
: BOILER MAINTENANCE SERVICE, PRESSURE PART MANUFACTURING, ENGINEERING, CONSULTING, INSPECTION, UPGRADE AND MODIFICATION
: Fabrication Pressure part of Boiler and Main steam pipe
• Economizer coil, Water wall Panel, Super heater coil, Stack, Piping, Vortex Finder, Tube bending RESPONSIBLE :
Control manufacturing boiler pressure parts such as Coil tube, Panel, Header, Tube bends.
Generate project schedule control and monitor and report work progress daily/weekly and monthly
report and summary report.
Provide fabrication manpower plan and efficiency for project.
Provide and improving necessary equipment, tools, parts, materials, specs and procedures for assembly process.
Maintaining and enhancing assembly yield, quality, productivity and cycle time at lowest cost through continuous improvement plan.
Coordinate with other department in order to improve production team.
Maintain of knowledge with respect to relevant up-to-date technology, equipment, and/or systems.
Develops and creates visual management tools to assist in monitoring KPI’s towards the overall corporate plan and continuous improvement.
Manpower recruit, utilize, arrangement & motivate to achieve work goal & company regulation.
Develops welding techniques and application of welding equipment to problems involving fabrication of metals, utilizing knowledge of production specifications, properties and characteristics of metals and metal alloys, and engineering principles.
Explain and training subordinate to understand WPS and any documents including code & standard that concern the job before starting work.
To be coordinating with the Project fabrication team, Client and other department concerning welding related issues, such as applicable welding procedures.
Analyze and evaluating the root cause of defects and deviations on yield, quality and productivity, develop / implement correction actions for improvement.
COMPANY POSITION
PLACE
PERIOD OF WORK PROJECT
: STP&I PUBLIC COMPANY LIMITED
: FIELD ENGINEER
: RAYONG
: MAY 2007 – MAR 2008
: REFORMER AND AROMATICS COMPLEX II
SERVICE TYPE RESPONSIBLE :
Plan, manage and monitor the activities, motivate and evaluate the subordinates’ performance.
Control and plan the daily work on the construction work to be in accordance with the plan and the
quality defined.
Supervise the implementation of assigned projects in accordance with the plan and timeline.
Receiving materials used in the project and supervising and storing work so compliance with safety regulations.
Check technical designs and drawings to ensure that they are followed correctly.
Ensuring projects meet agreed specifications, budgets or timescales.
Liaising with clients, subcontractors and other professional staff, especially quantity surveyors and the overall project manager.
Record accurate inspections carried out in line with the site documents.
Advise line manager and record where applicable any works not carried out in accordance with the
drawings and specifications.
Assist where required in the development of the commissioning procedures that are required for the project.
Review and comment in respect to As Built Drawings and operations manuals.
Monitor and advise line manager of all of the works within their specific area of concern.
ประวัติการฝึกอบรม
สิงหาคม 2567 ถึง สิงหาคม 2567
NTP Consuitant Group
Interpretation Requirement of ISO 9001:2015/ISO14001:2015/ISO45001:2018
สิงหาคม 2567 ถึง สิงหาคม 2567
NTP Consuitant Group
Internal Audit and Management Review of ISO 9001:2015/ISO14001:2015/ISO45001:2018
สิงหาคม 2567 ถึง สิงหาคม 2567
NTP Consuitant Group
Risk Assessment of ISO 9001:2015/ISO14001:2015/ISO45001:2018