Luang Prabang Hydropower Project.
Position : Senior Civil Engineer
• Plan the construction method and sequence of work with the Construction Manager. (Left Pier,
Powerhouse, Right Pier, Spillway, Navigation Lock)
• Plan and control of material purchases and usage such as formwork, scaffolding, reinforced steel,
structural steel in the project.
• Plan materials schedules such as formwork, scaffolding, reinforced steel and structural steel.
• Estimate quantity material construction for purchase (DOKA system, PERI system, structural steel,
timber etc.)
• Material requirements planning. (Steel rebar, concrete, formwork, scaffolding)
• Coordinate with suppliers (from DOKA, PERI) to ensure that all items are delivered on time.
• Responsible for preparing concepts and design solutions for new products (DOKA system and PERI
system) from initiation to production.
• Give advice on design and calculation of formwork and scaffolding using DOKA system, PERI system,
steel formwork, wood formwork by represent safe, economical and efficient designs.
• Give advice on the drawings 2D/3D by using AutoCAD or SketchUP after making calculations.
• Head of meeting with Sub-Contractors every month to update the progress of the work.
• Risk assessment report (OJT before working, check efficiency of tool prior to perform works, employee
must be wearing corrected PPE)
Xayaburi Hydroelectric Power Project.
Position : Site Civil Engineer
• Design and calculation of formwork and scaffolding using DOKA system and PERI system.
• Prepare the drawings 2D/3D by using AutoCAD or SketchUP after making calculations.
• Supervise formwork/scaffolding works, giving clear instructions to subordinates and Sub-Contractors,
to ensure quality control and compliance of materials and workmanship.
• Control the use of materials such as formwork, scaffolding, reinforced steel, structural steel in the
project.
• Record daily stock report for materials (formwork, scaffolding, reinforced steel, structural steel)
• Coordinate with Consultants, Designers, Sub-Contractors, Supervisors, Quantity Surveyors involved in
the project.
• Prepare bar bending schedules. (Temporary work, Pre-construction)
• Prepare monthly progress rebar report. (Temporary work, Pre-construction work)
• Control of wastage from cutting reinforcing steels no more than 5% of project.
• Meeting with Sub-Contractors every month to update the progress of the work.
• Training in safety & environmental to employees before work.
HRAP New Test Building 2,3 Project.
• Procure of Sub-Contractors for structure work and piling work.
• Prepare bar bending schedules.
• Material requirements planning. (Steel rebar, concrete, formwork, scaffolding)
• Preparing a schedule of material used and available.
• Prepare shop drawings on site of structural details such as steel reinforcement details, formwork
installation, rebar details.
• Control of construction work to be standard.
• Prepare weekly progress report for the Project Manager.
• Estimate all the material for construction in project.
• Control of safety & environment such as always wearing PPE, check quality tools.
MRT Purple Line Project, Contract 6: Trackwork (Bang Yai - Bang Sue Section)
• Inspection handover of work from civil work.
• Inspection and supervision of Track Plinth installation (installation formwork, installation rebar,
covering concrete, dimension check, rail inclination, electrical check, stray current collector, track
gauge, top of rail, cant (super elevation), spacing of dummy plates, position of anchor bolts)
• Prepare construction schedule (1+2 weeks)
• Coordinate with Consultants, Sub-Contractors, Supervisors, Quantity Surveyors involved in the
project.
• Ensure the availability of safe working conditions while executing the job (always wear PPE, check
quality tools)
Track Rehabilitation Project, Phase 5 (Kaeng Khoi Junction – Bua Yai Junction – Thanon Chira Junction)
• Supervision of earthwork such as earth excavation, filling, compaction and field density test to ASTM
standards.
• Equipment planning and management such as the number of equipment, time, type within the project
budget.
• Daily/weekly workforce planning.
• Prepare construction schedule (1+2 weeks)
• Weekly progress reports to the Construction Manager.
• Coordinate with Consultants, Sub-Contractors, Supervisors, Quantity Surveyors involved in the
project.
• Liaise with the local authority such as police.
ประวัติการฝึกอบรม
มีนาคม 2554 ถึง พฤษภาคม 2554
218 Construction Co., Ltd. Bangkok Thailand
Internship : Site Civil Engineer Intern
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (พอใช้) อ่าน (ดี) เขียน (พอใช้)
ไทย 50 คำ/นาที อังกฤษ 35 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
*Skills in Engineering program such as
AutoCAD
SketchUP
StaadPro
*Skills in Office program such as
Microsoft Office
Microsoft Project
*Soft Skills
Critical thinking, analytical, and complex problem-solving skills
Strong time management and project management skills
Communication Skills
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Volunteer - October 2008 (10 days)
Engineering Volunteer Construction Camp. Kanchanaburi Thailand
- Volunteer for multi-purpose building construction projects.
preparation department
Student Club of the Faculty of engineering
-House Keeping
-Design and Supervision theme