Robert Bosch Automotive Technologies (Thailand) Co., Ltd.
Dec 2022 to May 2023 (6 months)
Training in an Industrial Engineering role
Project
Change over time reduction in automatic assembly lineCycle time reduction in visual inspection Cycle time reduction in finished goods inspection processPlanning guideline for new products
Tasks
Design workplace in Ergonomic standard.Simulate working time by using Method Time Measurement (MTM) for each process.Create the standardize for workstation to define standard. working times.Analyze video cycle time analysis.Improve productivity.
Kojima Auto Technology (Thailand) Co., Ltd.
Jun 2022 to Jul 2022 (2 months)
Training in Production Improvement,
TPS & Process design
Tasks
Learning interior automotive part assemblyCreate the Material and Information Flow Chart.Create work instructions in the injection line.Create work instructions for the assembly line.Create standardize for work station to define standard working times in assembly line.
BKF Aerospace Co., Ltd.
Jun 2022 to Jul 2022 (2 months)
Training in Production Line,
Assembly and Jig Design Process
Project
Reduction of cycle time and improvement in assembly line
Tasks
Learning aircraft assembly.Analyze video cycle time analysis.Improve productivity and processes.Create standardize for work station to define standard working times.Convert product drawings to be processed assembly.Design a jig for improving the process.