Installation
- Pre/Post Signaling Wayside and Indoor Equipment Installation Checkout (PICO), e.g., Wayside Emergency Stop Plunger, Norming Point and Wayside Indoor Cabinets. Radio Equipment,
- Pre/Post Copper cable Installation Checkout (PICO), e.g., LAN, Fiber Optic and Copper cable.
Test and Commissioning Witness
-P lSaitgfonramlin Sgc Ereqeunip Dmoeonrt IFniteelrdfa Tcees Ct, aeb.ign.e, td (ePsScrDibICe )t.est step and expected result of Object Controller Cabinet (OBC) and
- Subsystems Interface Test, e.g., SIG – PSD, COM – SIG, SCADA – SIG and TRS – SIG.
-O Dpeanta SThroarntesmst isPsaiosnt FSirysstt,e Hmo tA Scctaenpdtabnyc Re oTuetestr, Per.ogt.o, ccooln annedc titvraitfyf,ic r elodaudn dteasntc.y, failure scenarios from the network router,
-s oDftawtaa rTer.ansmission System Integration Test, e.g., proper connection, settings and operation of the DTS hardware and
-o fT TraWinC t oe qWuaipymsiednet Cono mNmetuwnoicrak tiToinm e(T PWrCot)o Tcoels st,e erv.ge.r,. radio coverage, acceptable roaming threshold, time synchronization
- Correspondence Test, e.g., ensure that commands and indication of ATS HMI correspond with the wayside equipment.
t-h Sey tsetsetmab Alec creeqputairnecmee Tnetss.t, e.g., verify the functions of subsystem integration and ensure the overall system conforms to
t-e Sstiganbaleli nregq Suyirsetmemen Itnst.egration Test, e.g., ensure the performance functionality of the overall system conforms to the
- System Integration Test, e.g., verify and demonstrate the proper interaction between the various systems.
ธันวาคม 2562 ถึง พฤศจิกายน 2563
Signalling Inspector
TEAM Consulting Engineering and Management Co., Ltd.
Bangkok, 151 TEAM Building Ramintra 40 Rd.
สำหรับสมาชิกเท่านั้น
The Red Line Mass Transit System Project. (SRT)
Installation
- Pre/Post Signaling Wayside and Indoor Equipment Installation Test. (IIT)
Test and Commissioning Witness
-C Sircigunita alinngd IRnadiilvwidauya Sl iAgcncael.ptance Test (IAT), e.g., Axle Counter, Balise, Point Machine, Multiple Train Detector Track
- Restoration Test, e.g., Visual Inspection and Energization.
- Signaling Equipment Correspondence Test.
- Local Integration and Inter - Site Test.