Project:115-year-old building, grandmother teacher
Maharat Ubasikachan
Project: Renovate Sapha Dhammakaya
- Building models for structural work,
architectural work from construction work
- Perform active shaping (2D-Shop Drawings)
- Edit the Clash Detection generated by the
model.
- work under a plan of action BIM
(BIM Execution Plan) BEP
Project: Personnel accommodation building
at Sisaket Rajabhat University
- Control construction of
structural/architectural/systematic work, and
maintain construction order according to the
target.
- Model Bim Revit.
- Make a Shop Drawing By BIM.
Construction project control document
including project quality.
Civil Construction of Station & relay room,
road work & site drainage.
M&E works for the substation.
2D, 3D drawings.