●Control & Coordinate Owner, Designer, Sub-contractor.
●Control document all ISO 9001, 14001, 50001.
●Control & Check shop drawing follow design and requirement
EIT standard or maker standard.
●Control installation Sanitary system, Air condition system,
Ventilation system, Compress air system, Fire protection
system & Electrical system.
●Control material install indoor or outdoor. Such as bolt, nut &
Support for outdoor must be Hot dip or stainless.
●Prepare minute of meeting for weekly meeting.
●Prepare Schedule weekly & monthly.
●Inspection installation work follow standard.
●Test commissioning & Report.
●Control work to be complete for Handover to Owner.
●Check as-built drawing for Hanover to Owner.
ประวัติการฝึกอบรม
ไม่ได้ระบุ
THAI KAJIMA Co., Ltd.
Training Confined spaces for Controller.
ไม่ได้ระบุ
Institute in Pinthong Group Management and Consultants Co., Ltd.