- Planning for construction quality assurance requires
- The preparation of ITP, working procedure by the contractor before the start of work.
- Review
and comment ITP.
- Working procedure verify the quality control system for civil engineering, electrical,
mechanical, and measuring tools to be in accordance with the standards.
- Verify welder qualification test (WQT) quality control system
-
Verify the quality control system in non-destructive examination (NDE), destructive
examination (de) pressure test, loop test, function test
-
Verify the system and control the quality of work of QC construction and QC contractor.
- Supervise the construction work to be in accordance with the project requirements.
-
Verify the validity of the final document.
-
Issued QA certificate
- Understanding of engineering drawings (isometric, GD&T and GA)
- Have an understanding of viewing P&ID
- Have basic computer use program Microsoft office and solid work
- Have skills in measuring instruments, Micrometer, Vernier Caliper, Bore grade, etc.
- Basic knowledge of non-destructive inspection and NDE work.
- Have the skill to inspection welding.
- Understanding of construction and mechanical work and piping work
- Have basic knowledge of Coad standard ( ASME )
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
- สำเร็จโครงการ N2 O2 pipe line project
- สำเร็จโครงการ MOCD2 ( SCG ) Project
- สำเร็จโครการ HK2 Project
- สำเร็จโครงการ MTP New office building