- Defect found owner. priority fix safety and Quality defect fix as soon as possible.
And find a way to prevent it from happening again.
- Improve utilization at warehouse from 3200 spot to 4200 spot and set in SAP
system allow mix. More than one PM/RM can be stored in a single pallet to maximize
storage space. And installation rack for increase space more than a thousand
shelves.
- Lead team driver to installation new rack for improve space at warehouse.
- Lead team driver to add level beam for 6 to 7 Level improve space at warehouse.
- Write off waste owner. Count and monitoring 100% of the total volume must match
the SAP system correctly, but if it does not match, the IRA will adjust (in - out),
Support auditor audits before moving to destruction. Support auditor audits before
moving to destruction. And support the vendor, move the waste away to
destruction.
- Consumable owner open PO order. Control so that office spending is not higher
than necessary.
- Equipment warehouse owner. All equipment must always be in a ready-to-use
state and any defects must be corrected as soon as possible.
- Safety and Quality owner. Investigate incidents, find sustainable solutions to
prevent them from happening again, and share the incident report with share all
employees with solution plan.
- M&R Cost. Control procurement does not exceed the budget set in that year and
plan the work for the next year that it must. Buy something more or need to
maintenance and repair.
- Inventory owner (IRA) Plans every day checks the entire warehouse it takes two
months to complete one cycle. If it is not found or does not match, the SAP system
must urgently find a way to check it within 24 hours.
Defect fount and fix owner. Priorities, fix safety and quality defects as soon as
possible, and find ways to prevent them from happening again, and must correct at
least 95% of all defects.
- Support new production and qualify. Validate washout and sanitize production line
for validate confirm and set center line washout standard by formula product.
- Improvement productivity production line. Improvement kaizen and reapply. So,
the improve productivity line forget plan down time loss and unplan down time loss
for reduce time loss.
- Installation new machine and Qualify . Do IQ/OQ Protocol and Qualify for comfirm.
To ensure that the machine can work and bring quality products to consumer
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (ดี) เขียน (ดี)
ไทย 50 คำ/นาที อังกฤษ 60 คำ/นาที
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
- Improve utilization at warehouse from 3200 spot to 4200 spot and set in SAP
system allow mix. More than one PM/RM can be stored in a single pallet to maximize
storage space. And installation rack for increase space more than a thousand
shelves.
- Lead team driver to installation new rack for improve space at warehouse.
- Lead team driver to add level beam for 6 to 7 Level improve space at warehouse