Area Steam Turbine and HRSG
Cooling
Control Building
Water treatment Building
GIS Building
Transformer
Cable trench
Under ground / CW pipe
Road and Drainaga system
Survey Work
Check data survey close travese for coordinate and elevation
by survey method
Piling work and Bore pile, Check position and Elevatoin of pile
Check position and elevation of bolt,box out,opening,pading
Check and confirm center line before equipment setting
Check dimention,position elevation of building, foundation
Check dimention,position elevation road and drainage
Coordinate civil with mechanical
Control Survey Subcontractor's
Civil Work
Rebar ( type,diameter,spacing,location,quantity)
Formwork ( quality,support,cleaning )
Concrete ( mix code,slump,aircontent)
Control Civil Subcontractor's
Area Steam Turbine hall
Boiler
Cooling
Water treatment Building
FGD
Conveyor Area
Under ground / CW pipe
Road and Drainaga system
Survey Work
Check data survey close travese for coordinate and elevation
by survey method
Piling work and Bore pile, Check position and Elevatoin of pile
Check position and elevation of bolt,box out,opening,pading
Check and confirm center line before equipment setting
Check dimention,position elevation of building, foundation
Check dimention,position elevation road and drainage
Coordinate civil with mechanical
Control Survey Subcontractor's
Civil Work
Rebar ( type,diameter,spacing,location,quantity)
Formwork ( quality,support,cleaning )
Concrete ( mix code,slump,aircontent)
Control Civil Subcontractor's
4. บริษัท Posco Enginerring and Construction
โครงการ ก่อสร้างปิโตรเคมี Phenol 2
ตำแหน่ง QA/QC Civil ( 4/2557 - 4/2558 )
ประเทศ สิงค์โปร์
งานที่ทำ Area Structure 1 - 6
Pipe rack
Control Building
Road and Pavement
Survey Work
Check data survey close travese for coordinate and elevation by survey method
Piling work and Bore pile, Check position and Elevatoin of pile
Check position and elevation of bolt,box out,opening,pading
Check and confirm center line before equipment setting
Check dimention,position elevation of building, foundation
Check dimention,position elevation road and drainage
Coordinate civil with mechanical
Control Survey Subcontractor's
Civil Work
Rebar ( type,diameter,spacing,location,quantity)
Formwork ( quality,support,cleaning )
Concrete ( mix code,slump,aircontent)
Control Civil Subcontractor's
Document
Civil Package
Request For Inspection
Meteriai testing
5. บริษัท Marubeni corporation
โครงการ โครงการก่อสร้างโรงไฟฟ้าวัน้อย 4 , WNCC 4
ตำแหน่ง Civil Engineer ( 2/2555 - 8/2556 )
ประเทศ ประเทศญี่ปุ่น
งานที่ทำ Area Steam Turbine hall
Control Building
Boiler
Cooling
Under ground / CW pipe
Road and Drainaga system
Survey Work
Check data survey close travese for coordinate and elevation
by survey method
Piling work and Bore pile, Check position and Elevatoin of pile
Check position and elevation of bolt,box out,opening,pading
Check and confirm center line before equipment setting
Check dimention,position elevation of building, foundation
Check dimention,position elevation road and drainage
Coordinate civil with mechanical
Control Survey Subcontractor's
Civil Work
Rebar ( type,diameter,spacing,location,quantity)
Formwork ( quality,support,cleaning )
Concrete ( mix code,slump,aircontent)
Control Civil Subcontractor's
6. บริษัท Sino Thai Engineering and construction
โครงการ โครงการก่อสร้างโรงไฟฟ้าจะนะ 1 , CCPP 1
ตำแหน่ง QC Civil ( 2548 - 8/2552 )
ประเทศ ประเทศไทย
งานที่ทำ Area Steam Turbine hall
Control Building
Water treatment Building
Cooling
Road and Drainaga system
prepare document for inspection
Inspection civil and survey work
Coordinate with Ower and Main contact
ประวัติการฝึกอบรม
ไม่ได้ระบุ
สถาบันพัฒนาฝีมือแรงงาน ยะลา
เทคนิคการสอนงาน
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
คอมผิวเตอร์ ( excal , auto cad , survey program sketch up Basic )
วางแผนงานก่อสร้าง
ประมาณการวัสดุ
มีมนุษย์สัมพันธ์ที่ดี
มีวุฒิภาวะการเป็นผู้นำ
มีทัศน์คติที่ดีต่อองค์การณ์