Job Responsibility (Operation and Maintenance Activity)
- Supervise the power plant operator. To be able to generate electricity
efficiently Meet the requirements and According to the goals that have been set
- Supervise the Fuel production plant for boiler. To be able to produce fuel efficiently Meet the
requirements and According to the goals that have been set
- Supervise and inspect the Maintenance of the Power plant. To operate properly and safely and
consider improvement and development operational methods to continually increase efficiency
- Supervise and inspect the Maintenance of Fuel production plant for boiler. To operate properly
and safely and consider improvement and development Operational methods to continually
increase efficiency
- Preventive Maintenance Planning and Controlling for Power plant and Fuel production plant for
boiler
- Planning and controlling costs in the production and maintenance department.
- Planning and Controlling of Machine improvement project.
- Energy Conservation project and controlling
- Supervise the Maintenance team (10 people)
- Supervise the Operation team (35 people)
For Maintenance Activity
Experience : Responsibility to Electrical & Instrument and Mechanical Maintenance for Biomass
Power plant
- To maintain and maintenance Boiler fuel feeder conveyer system
- To maintain and maintenance Boiler system : VYNCKE ,Steam flow 55t/h Temperature
420 °C , Operating Pressure 43 bar (a) ,Total Water capacity 108 m3
- To maintain and maintenance Steam Turbine : SHIN NIPPON , Rated Power
(GENE.END)
9950 kW , Speed (Turbine/Generator) 6222/1500 rpm , Inlet steam pressure 40
bar(A) , Inlet steam temperature 415 °C
- To maintain and maintenance Synchronous Generator : MEIDEN 11706 kVA
,6600 kV
- To maintain and maintenance cooing tower system - To maintain and maintenance
water treatment plant
- To maintain and maintenance Electrical and instrument system
Step up transformer : 6.6kV / 33kV 11.50 MVA, EKARAT Transformer
,ONAN/ONAF type
MV Switch gear 33 kV and 6.6 kV : “Schneider Electric”
Distribution transformer 400V/6.6 kV 2000 kVA, EKARAT Transformer ,ONAN type
Main distribution board : HITACHI AS332 , 460V ,3200A
Variable speed control : VOGON NX AC drive ,FUJI FRENIC-Multi
PLC control system :
- Siemens S7-300 for control boiler system
- ABB AC800F for control Turbine system
- PANASONIC FP-X C60R for control RO system
- PLC control system (Allen-Bradley logix5000 “V18”). For control Fuel handing system
- Maintenance work
: Maintenance planning and control for Mechanical, Electrical & Instrument
equipment
: Machine Improvement and corrective for Mechanical and Electrical & Instrument
: Cost control for maintenance work
: Spare part control for Mechanical and Electrical & Instrument equipment
: Document control for maintenance work.
: Supervise the Maintenance team (8 people)