SMCC (Thailand) Co., LTD. | Sumitomo Mitsui Construction Co., Group.
Structural Engineer
- KOMATSU OFFICE (BANG KOK KOMATSU SALES CO., LTD.)
Canteen 21.00 x 32.00 m.
Paint room 15.00 x 20.00 m.
KGO Warehouse 10.00 x 50.00 m.
Flag Pole
- HINO KINGKAEW RENOVATION (MITSIAM MOTORA CO., LTD)
Service Area 10.00 x 48.00 m.
- NEW FACTORY PROJECT PHASE-02 (SEI THAI ELECTRIC CONDUCTOR CO., LTD)
Canteen 12.00 x 36.00 m.
Substation 16.00 x 59.00 m.
Water System 10.00 x 20.00 m.
Scrap Station
Water Tank
Garbage Room
- MARUYASU NEW EXTENSION FACTORY PROJECT (MARUYASU INDUSTRIES (THAILAND) CO., LTD)
Scrap Station
Settlement Tank
Cooling Tower system-1
Cooling Tower system-2
- BAT NEW FACTORY PROJECT (TOYOTA BOSHOKU ASIA CO., LTD)
Scrap Area
Foundation of Cooling Tower
- NEW TENT HOUSE PROJECT (NIDEC ELECTRONICS (THAILAND) CO., LTD)
Tent House 24.00 x 48.00 m.
Locker ขนาด 12.00 x 40.00 m.
Store ขนาด 30.00 x 81.00 m.
Rest Area
- BANGPAKONG DISTRIBUTION CENTRE PHASE-II PROJECT (THAIYOKOREICO., LTD (Bangpakong D.C.)
Office 16.00 x 42.00 m.
Pump House 10.00 x 12.00 m.
- CUSTOMS OFFICE PROJECT (TC MANUFACTURING AND ASSEMBLY (THAILAND) CO., LTD)
Customs Office 6.50 x 9.50 m.
- NTCSEA TEST BUILDING CONSTRUCTION PROJECT (NISSAN MOTOR ASIA PACIFIC CO., LTD)
Gas Station ขนาด 19.80 x 20 m.
- NEW FACTORY PROJECT PHASE-03 (SEI THAI ELECTRIC CONDUCTOR CO., LTD)
COOLING TOWER 16.00 x 14.00 m.
COOLING TOWER 25.00 x 10.00 m.
RO TANK 10.00 x 17.00 m.
WATER TANK 9.00 x 15.00 m.
- CKD WAREHOUSE (LAND-B) PROJECT (TC MANUFACTURING AND ASSEMBLY (THAILAND) CO., LTD.
PDI CENTER FOR PV 20.00 x 65.00 m.
PDI CENTER FOR CV 20.00 x 40.00 m.
UTILITY BUILDING 4.40 x 11.25 m.
- (HIAMS) AS-GW #2Plant Phase-1 PROJECT (HITACHI AUTOMOTIVE SYSTEMSASIA, CO., LTD
FACTORY 90.00 x 102.00 m.
UTILITY 8.00 x 64.00 m.
2011-2013
Ua Withya Public Company Limited
Structural Engineer
Design Structure, Steel support structure with Sap 2000 program or Tower3-5 Program
- Substation Equipment 115 kv. Of EGAT
- Substation Equipment 115 kv. Of PEA
- Antenna Tower 32.00 m. 115/22 kv. Subatation Nong Deun Project, Electricite Du Laos
Fabrication Drawing Work, Prepare Shop Drawing structure to general fabrication
- Futsal Stadium, Bangkok
- SSIC New Factory Hemaraj Saraburi Industrial Land, SCG Heim
- The Walk ,Index Living Mall, Bangkok
Bidding Work, Estimate unit weights of Structure to bid
- Substation Equipment 115 kv. Of EGAT
- Substation Equipment 115 kv. Of PEA
- Tower 500 kv.