- Management control for piping fabrication
and installation on field
- Management control for hydro test and flushing of
piping System before installation on field.
- Design Lifting plan and present method statement
for piping installation on field
and installation on field.
- Work permit control.Piping
for piping installation on field
and installation on field.
- Inspection and Supervise day-to-day administration of the Storage Truck Loading Skid Systems . Mechanical Installation
- Inspection according to the Inspection and Test Plan (ITP), Work Procedure, Work Method Statement
- Review and comment inspection report for MDR. and final as built drawing
- Ensure contractor’s work is carried out safely and efficiently in a competent manner
- Assist in the resolution of interface problems with other contractors
- Progress and direct contractors to ensure work is completed in a timely manner
ไม่ได้ระบุ
Site Engineer
บริษัท จีเอน คอมเพรสโซ จำกัด
Samutprakan
สำหรับสมาชิกเท่านั้น
- Management control for piping fabrication
and installation on field.
- Management control for hydro test and flushing of
- Design Lifting plan and present method statement
- Work permit control.Piping
for piping installation on
- Ensure contractor’s work is carried out safely and efficiently in a competent manner
- Progress and direct contractors to ensure work is completed in a timely manner.
ไม่ได้ระบุ
Service Engineer
บริษัท สยามราชคอร์ปอเรชัน จำกัด
Samutprakan
สำหรับสมาชิกเท่านั้น
- Installation of high pressure natural gas compressor systems
- The construction work of pipe support and steel structure fabrication, erection
- Installation Refrigerant, Pumps, Plate Heat Exchanger, Evaporative Condenser Valves and Control Compressors,
- Fully responsible for preparing and inspecting NGV equipment service stations to prepare before use
Weatherford KSP, Co.LTD, Songkhla yard
Position: Technical Support
Responsibility :
- Full responsibility for prepare and check equipment for mud logging unit at offshore, onshore, rig up unit and all equipment as required, to conform with scopes of work and ensure all installation are performed in a safe manner.
- Monitoring implementation and providing expert function support to
rig required.
- Preventive Maintenance Equipment & Tool
- Work in this industry construction field work and shop manufacturing steel work more than Six years (May 2011 to 2017)
- Work in this industry construction field work and shop manufacturing Electricity&instrument work more than four years (Jun 2017 to Nov 2021)
Working experience in construction projects activities such as quality inspection, supervision and controlling all process and monitoring of the Piping & Structural Steel Fabrication & Installation and Erection Iron work, Storage Tank works, Equipment &Mechanical works, in The Power plant, Petrochemical and Chemical plant, construction and maintenance of NGV gas stations for PTT,Electricity&instrument work Oil and Gas Assembly process onshore modules.