-Monitoring and Control dimension as per drawing
-Visual Inspection of Fit-Up and Welding Joint
-Quality control according Welding procedure follow WPS.
-Made non-destructive testing according customer require.
-Visual Inspection of Fit-Up and Dimensions Vogt Power Project
กันยายน 2562 ถึง เมษายน 2564
Qa Inspector
MRP Engineering CO., LTD.
88 ม.5 ต.เหมือง อ.เมือง จ.ชลบุรี
สำหรับสมาชิกเท่านั้น
- Monitoring and Control dimension as per drawing
- Visual Inspection of Fit-Up and Welding Joint
- Quality control according Welding procedure follow WPS.
- Made non-destructive testing according customer require.
- Inspection about painting according specification as per drawing. And made report support Engineer.
- Final dimension inspection and made report support Engineer.
- Monitoring and Fix Spot welding machine in production lines.
- Inspection part before send to the next process.
- Repair defect part by FCAW process.
- Problem solving and investigation of production problem.
- Able to drive Forklift.