Work experience with fabrication of pressure vessels and heat exchanger
Planed and controlled schedule, take the material, Manpower plan equipment, and fabrication
พฤศจิกายน 2561 ถึง มีนาคม 2562
นักศึกษาฝึกงาน
USE.FLO-LINE CO.,LTD.
101/11, Khlong Nueng, Khlong Luang, Pathum Thani
สำหรับสมาชิกเท่านั้น
Trainee Production Department and Engineering
พฤศจิกายน 2556 ถึง กุมภาพันธ์ 2557
Trainee Technician Department from Suzuki
อาร์เฮงวัฒนา จำกัด
89 M.12 Mittraphap Road T.Mueang Kao Amphoe Meuang,Khonkaen 40000
Microsoft Office Word, Excel, Powerpoint, Outlook
Solid Work 2009 to 2018
Auto cad 2007 to 2021
Microsoft Project
ISO 9001:2015
Associate Mechanical Engineer (License No. ภก.50604)
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Sep’ 2021 – Feb’2022 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of Heat Exchanger 20AE20 (IRPC Public Co.,Ltd)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Sep’ 2021 – Feb’2022 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of Instrument Air Receiver Drum (PTTLNG Co.,Ltd)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Sep’ 2021 – Feb’2022 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of TK-14021A 35% HCL Tank (Asia Silicones Monomer Limied.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Aug’ 2021 – Sep’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of Carbon Vessel 2 Unit. No.360-cc-650 and 360-cc-660 (Total Corbion)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Jul’ 2021 – Sep’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Replace and Re Tube of Heat Exchanger No. M-EA 1304B (SCG. TPC.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Jul’ 2021 – Aug’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Re Tube of Heat Exchanger No. M-EA405 (Thai Plastic and Chemical.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Jul’ 2021 – Aug’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Re Tube of Heat Exchanger No. 3E-1802(A) (Bangchak)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
•
Jul’ 2021 – Jul’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Assembly and Pneumatic Test of Heat Exchanger No. 03E006A (IRPC.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Jul’ 2021 – Jul’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Re-Tube of Heat Exchanger No.E-981 (Thai Polyethylene Co.,Ltd.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
May’ 2021 – Oct’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of TK-236B Isopar-E Storage Tank. (Thai Polythylene. Co.,Ltd.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Apr’ 2021 – May’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Re-Tube of Heat Exchanger (IRPC.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Apr’ 2021 – Jun’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of UF Tank (LPE.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Apr’ 2021 – May’2022 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication Heat Exchanger 3 Units (BST #Site 1)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Mar’ 2021 – Jul’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of Heat Exchanger 3 Unit. (SGC. MOC)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Mar’ 2021 – Oct’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of Reactor 2 Unit and Drum Tank 40 Unit. (SCG. Repco)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Mar’ 2021 – Mar’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Re-Tube Of Heat Exchanger (IRPC.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Mar’ 2021 – Jul’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication Drum (SCG #Site 3)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Feb’ 2021 – Apr’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication Tube Bundle (BST #Site 1)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Feb’ 2021 – May’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication Carbon Vessel (Purac (Thailand) Ltd./ Total Corbion)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Dec’ 2020 – May’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication U Tube Bundle (IRPC)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Dec’ 2020 – Jan’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication Pressure Vessel 2 Units. (LPE Company Limited.)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and fabrication
Sep’ 2020 – Feb’2021 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication Effluents Tank (Vinythai)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and โFabrication
Apr’ 2020 – Nov’2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication Heat Exchanger (IRPC)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Jun’ 2020 – Oct’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New fabrication of stainless Vessel blow down tank (BST#2)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Jun’ 2020 – Sep’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New fabrication of Pressure Vessel 5 Units. And Platform (PTTGC2)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Aug’ 2020 – Aug’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Re-tube Heat Exchanger 3 Unit. (Thai oil)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Apr’ 2020 – Jul’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New fabrication of Pressure Vessel 5 Units. And Platform (PTTGC2)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Mar’ 2020 – Jun’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New fabrication of Heat Exchanger 3 Unit. (BST#2)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Jul’ 2020 – Jul’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Re-tube of Heat Exchanger 3 Units. (IRPC)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Apr’ 2020 – Jul’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of Heat Exchanger (Tube Duplex) (TPC-SGC)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Mar’ 2019 – Mar’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : Re-tube of Heat Exchanger 3 Unit. (IRPC)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication
Nov’ 2019 – Jan’ 2020 (BEC.Co.,Ltd.)
• Position : Project Engineer
• Project : New Fabrication of Heat Exchanger (IRPC)
• Duties : Planed and controlled schedule, take material, Manpower plan equipment and Fabrication