• Assists Manage to Manager Subordinate's Organization to achive the department 's goals.
• Review and approve process flow and process Instructions for manufacturing.
• Reviews daily yield and out of box (BOA) data for immediate action.
• Instruct process engineer to do failure analysis on customer feedback issues, and provides the short term and long term corrective action.
• Review and acknowlagement the statistical process control managemnet plan (SPC) before implementation into the production fall.
• Instruction and follow the special build requests (SBRs) or engineering evaluation for process improvement and development.
• Review weekly report of inprocess data and process capability data for corrective action.
• Review and approve equipment qualification before release to production.
• Trains and develops subordinates performance and knowledge and ensures efficiency.
• Knows your customer's expectations and drives actions to meet them.
กันยายน 2539 ถึง กรกฎาคม 2548
Process Engineer
TCL Thomson Electronic (Thailand) Co., Ltd.
141 Moo 5 Bangkadi Industrial Park, Muang, Pathumtani 12000
สำหรับสมาชิกเท่านั้น
• Manage and control Engineering , Process and Maintenance & Tool
• Participate in plant Programs and committees as required to support plant goals.
• Assume overall responsibility for Preparing and improvement of new / existing Product Introduction.
• Assume overall responsibility for maintenance and improvement of new existing equipment.
• Analyze, definite, plan and perform to develop and improve products, and production capacity to ensure maximum productivity, meet customer requirements, cost reduction and safety
• BOM ( Bill of Material ) creating, BOM structure, Process Assembly
• MAI ( Manufacturing Assembly Instruction ) issue for Production line
• Standard time , Cycle time , Headcount control for new/exist product
• Process flow, Structure line installation, Jig fixture preparing.
สิงหาคม 2537 ถึง กันยายน 2539
Engineer
Asahi Electronic ( Thailand ) Co., Ltd.
สวนอตุสาหกรรมนวนคร
สำหรับสมาชิกเท่านั้น
• Analyze, definite, plan and perform to develop and improve products, and production capacity to ensure maximum productivity, meet customer requirements, cost reduction and safety
• New product introduction investment preparing
• BOM ( Bill of Material ) creating, BOM structure, Process Assembly
• Process flow, Structure line installation, Jig fixture preparing.
• Preparing WI ( Working Instruction ) for Process assembly.
• Evaluate defect / find out solution .
• Designed and modify equipments / fixture / tools used in operation support to be proper function.
• Establish new parts & sample testing specification approval, including drawing.
• Standardize life time control product quality related parts, jig tool.
• Products responsible : CASIO clock/ CD player /Tape cassette player
1993 ~ Jul 1994 Project Engineer : Shane International (Thailand) Co., Ltd.
• Control & response Site Project installation Control panel Equipment at TPI company Maptapud Industrial park.
• Electrical Wire cable / Wire cable control laying
ประวัติการฝึกอบรม
พฤษภาคม 2542 ถึง มิถุนายน 2542
KAIZEN Institute of Japan
KAIZEN Implementation
มิถุนายน 2549 ถึง สิงหาคม 2549
Thai-German Institute
Production Technology Development & Transfer Center
Project cost saving / Productivity Production Line
-Implement KAIZEN on Production line
-Six sigma Project Process Improvement
-Supplier Small parts HDD MFG cost saving
-Scrap cost improvement : reduce Scrap cost MFG
-VDO Presentation CEO visiting
-Quality Small parts HDD coperation with Supplier