Maintenance for Electrical and Instrument System
1. Perform 4,6 month and 1 Year maintenance on all Instrument and Electrical equipment in the field.
2. Comply with the permit to work, Hot Work, Isolation Work.
3. Maintain, troubleshoot, repair, and preventive maintenance of the electrical system and electrical-related equipment.
Examples of such equipment are motors, electrical power generators, gas turbines, switchgear, power distribution system, HVAC, AC/DC lightings, UPS, industrial cloth washer/Dryer, etc.
4. Maintain, troubleshoot, repair, and preventive maintenance of instrumentation and control-related equipment/systems.
Examples of such instrument and control-related equipment are field instruments, gas turbines, controllers, transmitters,
transducers, fire, and gas detection systems, distributed control systems, shutdown systems, pneumatic control equipment such as control valves, shut down valves, etc.
กุมภาพันธ์ 2558 ถึง กุมภาพันธ์ 2563
Electrical and Instrument Technician
SPIE Oil & Gas Services (Thailand) Ltd.
Offshore as: PTTEPI Zawtiza field in Myanmar
สำหรับสมาชิกเท่านั้น
Maintenance for Electrical and Instrument System
1. Perform 4,6 month and 1 Year maintenance on all Instrument and Electrical equipment in the field.
2. Comply with the permit to work, Hot Work, Isolation Work.
3. Maintain, troubleshoot, repair, and preventive maintenance of the electrical system and electrical-related equipment.
Examples of such equipment are motors, electrical power generators, gas turbines, switchgear, power distribution system, HVAC, AC/DC lightings, UPS, industrial cloth washer/Dryer, etc.
4. Maintain, troubleshoot, repair, and preventive maintenance of instrumentation and control-related equipment/systems.
Examples of such instrument and control-related equipment are field instruments, gas turbines, controllers, transmitters,
transducers, fire, and gas detection systems, distributed control systems, shutdown systems, pneumatic control equipment such as control valves, shut down valves, etc.
1. Experience as Instrument Engineering.
‐ Sizing and selection of field instrument.
‐ Design of field instrument.
‐ Technical Bid Evaluation, BOQ, Cost estimate.
‐ Site survey an existing plant, prepare document, Man hour and cost estimate
for plant modification.
‐ Commissioning and Start up SCG‐Dow Chemical “Wastewater Treatment” and
other.
‐ Installation work of Instrument device, Program PLC (Step 7 –Siemens), Control
progress, schedule and cost for project, Site engineer for construction, Preventive
maintenance of field instrument.
2. Experience as Electrical Engineering.
‐ Design and selection of field Electrical.
‐ Technical Bid Evaluation, BOQ, Cost estimate.
‐ Site survey an existing plant, prepare document, Man hour and cost estimate for
plant modification.
‐ Commissioning and Start up SCG‐Dow Chemical “Wastewater Treatment” and
other.
‐ Installation work of Electrical device, Control progress, schedule and cost for
project, Site engineer for construction, Preventive maintenance of field electrical.