Leo Jovian Thai Engineering (Jan 2021 to present)
Geotechnical Instrumentation Engineer
• The MRT Orange Line (East Section)
- Convergence monitoring bolt testing, total pressure cell testing along the tunnel.
- Rod Extensometer monitoring soil above the tunnel.
- Inclinometers and Magnetic extensometer monitoring.
- Tiltmeters application.
- Check and report soil measurement results to project manager.
Ritta Company, Bangkok, Thailand (Internship)
Project site BRB-TWN, Taweewattana, Bangkok, Thailand (2 months)
• Provides timely reports, progress picture reports, event report: deficiencies, hindrance notification, delays, damage report or other related reports as requested with organized documentation controls through software records (Microsoft Excel) and regular progress updates.