Review & Comment permit to work and Job safety & Environment analysis.
Approved Permit to Work with Sub-Contractor
Control inspection tool and equipment.
- Inspection Material Received / Material On-Site (Conduit & Fitting & Acessories)
- Inspection & Test Factory Acceptance Test (FAT) Fire Alarm Control Panel System
- Inspection & Test Factory Acceptance Test (FAT) Power Distribution Board (PDB Panel) EE,IE
- Inspection Cable Specification On Drum (EE/IE)
- Continuity & Megger Test On Drum Electric Cable (EE/IE)
Prepare shop drawing for Construction & As-Built
Planning schedule & Construction work
Supervise overview field work.
Advice relate to field construction for Electrical and Instrument work such
- Electrical Work (EE)
Installation and Inspection Test Electrical Work
- Conduit and JB, Install Cable tray & Support & Equipment
- Electrical Cable (Power & Control Cable)
- Lighting / Receptacle / Lightning Building System
- HVAC / CCTV / PA / LAN / Acess Control System
- Fume Hood & Scrubber System & Equipment for Laboratory Room
- Cable test, Site Acceptance Test (SAT), Function Test
Commissionning & Start-Up
- Instrument Work (IE)
Installation and Inspection Test Instrument Work
- Conduit and JB, Install Cable tray & Support & Equipment
- Instrument Cable (Signal & Control Cable)
- Field Instrument (Gas Detector) on New CCR & Lab. Building
- Monitor Console for Boardman at New CCR Room
- Remove DCS System from CCR Existing to New CCR Building
- Cable test, Site Acceptance Test (SAT), Function Test
Commissionning & Start-Up
Job Description
Engineering material & Package equipment
Planning schedule & Construction work
Project drawing Planning & Coodinator PTW with Owner
Prepare shop drawing for Construction & As-Built
Site survey & clear scope for bidding
Take BOM & BOQ for quotation
Installation / Inspection & Test Electrical Heatracing System
Control progress and delivery just in time.
Inspection & Loop test
- Inspection & Test Report
- Function Test & Loop Test
- Inspection Termination & Wiring Connection Cable
- Testing Electrical & Instrument Cable (Power,Control,Signal Cable) and Prepared Test Report
- Testing Impulse line Tubing Leak and Prepared Test Report
- Testing Lightning & Grounding and Prepared Test Report
Commissioning & Startup Plant
ob Description :
Engineering material & Package equipment
Planning schedule & Construction work
Prepare shop drawing for Construction
Planning & Coodinator PTW with Owner
As-built drawing
Inspection & Loop test
- Inspection & Test report
- Loop test & Function test
-Commissioning & Startup Plant
Microsift Word / Excel / Power Point / Outlook / Auto Cad / NavisWork 3D
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
MOCD2 project Increase ethylene production by 300 kta. (Start 2020)
-Installation Equipment
-Loop Test / Function Test
-Commissioning & Start-Up Plant
SCG Site#7
Map Ta Phut Olefins Co.,Ltd.
New CCR and Laboratory Building Project (BST Site #2) , (Start 2022)