302 Moo1,Nong krathum, Doem Bang Nang Buat, Suphanburi,72120, Thailand
Tel. 035-446769 , Fax.035-446778
สำหรับสมาชิกเท่านั้น
ITP Review, Submits Procedure WPS,PQR and WQT, ITP
Welder Certificate report and Card test Reference ASME IX
Responsible Welder qualification status/ Welder control.
Perform Fit up ,Final visual & dimensional inspection.
Inspection welding joint before and after
Ensure fabricated Pipe spools as per drawing.
Request for NDT control as per the requirements.
Review and acceptance of inspection reports from Third Party Inspector .
Witness Pressure test and Flunshing line cleaning
Responsible Piping Test package and final handover documents.
MDR hand over
Responsible and relevant to the maintenance of
machinery in the production line, maintenance according to
the plan by providing maintenance (Maintenance Engineer).
(Preventive Maintenance: PM)
Repairing damaged equipment and machinery spare parts for good
quality so that it can operate as target And increasing
the knowledge and working skills to personnel involved in
maintenance work (Maintenance) with
ประวัติการฝึกอบรม
มกราคม 2564 ถึง มกราคม 2564
Rajchapleuk Engineering
Magnetic Particle Testing (MT) Level II (Yoke Technique )