- Prepare project progress reporting.
- Review IFC drawing.
- Prepare shop drawing for fabrication, layout drawing for construction and presentation.
- Prepare work method statement and procedure for tank erection, etc.
- Prepare temporary construction facilities layout.
- Design and develop tank erection method.
- Prepare material take off for tank erection temporary jig, temporary structure.
- Prepare lifting plan for tank erection.
- Prepare permit to work and relate documents for construction work
- Prepare 2 weeks look ahead for monitor construction work.
- Planning and manage manpower, tool and equipment during construction work.
- Monitor and troubleshooting tank construction work.