RF Team
Tuning each Problem Area (PA) of cluster to optimum point and find next solution.
Report Acceptance cluster and Tuning cluster, Monitor KPI and OSS Stat after cluster on-air.
Tuning and Acceptance Report in UMTS/LTE 2100MHz and LTE/2300 MHz
สิงหาคม 2556 ถึง กรกฎาคม 2560
RF Engineer
CCS , Bangkok.
-
สำหรับสมาชิกเท่านั้น
RF Team
Survey existing 850MHz and New site LTE/2100MHz in Project TRUE.
Tuning each Problem Area (PA) of cluster to optimum point and find next solution.
Acceptance cluster and Tuning cluster, Monitor KPI after cluster on-air.
SSO and CVT Tuning and Acceptance Report in 850MHz ,UMTS/LTE-2100 MHz and LTE/2300 MHz.
January 18, 2012 to March 30, 2013 Mobicrat co,.ltd, Bangkok.
(1 year 3 month) Project : PM/IBM, Suvannapum Airport.
Check Mobile System in Airport
Periodic Maintenance Mobile Room in Airport
+ Tranmission System.
+ Electrical System.
+ Distributed Antenna System.
+Civil and Room Facilities Check.