97/1 Soi Ladprao 114, Ladprao Rd., Phlaphla, Wangthonglang, Bangkok10310
สำหรับสมาชิกเท่านั้น
1. Planning and quality control of construction work by site.
2. Control the team. And subcontractors in the construction operations according to the plan assigned
3. Coordinate and allocate work to the team. And the work of subcontractors So that the work is done easily and neatly
4. Follow up on the progress, investigate and solve problems and report according to the assigned construction plan.
5. Plan, review the list of materials used at the site. To deliver to the purchasing department to prepare
6. Quality control of work. Including solving problems on site
7. Check the time in and out of the technician every day. And bring documents to the office
8. Check and control the cost of work in each project for efficiency.
9. Make a plan To report the progress of work on a daily, weekly, monthly plan Including other related plans
10. Prepare a BOQ to estimate prices and construction costs.
11. Make a feasibility report of each project and solve problems on site. So that the work is in accordance with the scheduled schedule
1. The construction plan, allocate tasks to team members and contractors.
2. Control the construction according to the plan.
3. Check and report on progress of the work plan, construction assignments.
4. Monitor and Monitor Engineer / contractor to the standards. Steps to correct
5. Control construction costs, according to the budget approved.
6. Procurement and Materials And tools to meet the project implementation. And check availability before the operation.
7. During drafting of the piping and steel structure fabrication drawings, progressively
1. Piping and steel structure designer proceed with production of piping and steel structure
2. Fabrication drawing, either by updating the AFC drawing or using a suitable go-by
3. During drafting of the piping and steel structure fabrication drawings, progressively compile the BOM.
4. Complete and self-check the drawing.
5. Stamp with CHECKPRINT Stamp, and sign in appropriate box.
6. Forward to Piping Designer for checking.
7. Review check print as applicable as following
8. Check Drawing Title Block such as Drawing Title, Drawing Number / Sheet
Number Correct & With Flow, Reference Drawings, P&ID, Service Test
Pressure, Test Medium, Hydro Test Pressure, Paint Spec, PWHT
Requirement, Design Pressure, Design Temp, NDT and Insulation.
9. Assess the costs of which have been designed to commander.
10. he BOM shall be checked together with its associated detail drawing.
11. Make comments on the drawing and sign the appropriate box in the Check print Stamp.
12. Red Line Mark Ups information for As Building.
13. Summarize and report progress and problem of job assignments. Send boss
ประวัติการฝึกอบรม
เมษายน 2559 ถึง เมษายน 2559
NTP Consultant Group
Interpretation Requirement ISO 9001:2015/ IATF 16949:2016
เมษายน 2559 ถึง เมษายน 2559
NTP Consultant Group
Interpretation IQA and MRW ISO 9001:2015/ IATF 16949:2016
เมษายน 2559 ถึง เมษายน 2559
NTP Consultant Group
Interpretation Risk Assessment ISO 9001:2015/ IATF 16949:2016
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (ดี) เขียน (ดี)
ไทย 50 คำ/นาที อังกฤษ 45 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
1. P & ID, piping General arrangement.
2. Drawing GA and P&ID and isometric by program AutoCAD.
3. Design 3D modeling for render graphic by AutoCAD 2008 , Auto Plant 3D.
4. The BOM shall be checked together with its associated detail drawing.
5. BOM & BOQ
6. Assess the costs of which have been designed to commander.
7. Red Line Mark Ups information for As Building.
8. Design & Drafting
9. ASME Standard
10. Microsoft project