Responsibility: Management new project transfer to ThaiLand plant & QA
-Engineer communication china and control all
-New project and New Product transfer to Thailand plant
-WI (SOP) create control and Process set up
-Machine management & Jig Fixture set up,E
-Over all contact customer and Auditor support plant
-Maintenance team and Facility control (Electric,Fire alam,Air compressor system)
-Production improvement productivity output on plan (LOB,Cycle time improve)
-Managing the policy of quality assurance and quality control, investigating and setting
standards for quality
-Specifying quality requirements of raw materials with suppliers
-Working with operating staff to establish procedures, standards, systems and procedures
-Assessing customer requirements and ensuring that these are met
-Lead Quality System activities Ex. internal/ external audit,How to PCB checking
-Quality team control ,SQA,Model spec, PFMEA,DFMEA, FAI,FSG,Customer audit
-The PCB confirm with Supplier and Data Gerber file TQ , Spec PCBA, Audit Vendor
-Communicate data china transfer to thailand,Windows control
กรกฎาคม 2560 ถึง มิถุนายน 2563
Asst.Manager
ไทยดีจีที จำกัด
ต.เขาไม้แก้ว บางละมุง
สำหรับสมาชิกเท่านั้น
Responsibility: Development & Production control and improvement
-SMT,Auto,PBA line production support
-SMT machine, Reflow,AOI
-Auto machine, AI, Owen
-Process control (LOB efficiency),Improvement, ESD training,WI document
-Process Quality control (PQC)
-JIG fixture and Machine PM and efficiency
-Factory system and Flowchart produce
-ERP system support and network
-ISO (90001,45001,14001) Risk management ,Auditor and Consult audit
-Safety (คปอ) ,จป หัวหน้างาน, จป ระดับบริหาร
Development Engineer
-New model,Contact HQ and Customer order (ECN,ECR,4M change) system
-Model spec, Component of vendor, Model assembly
-Mold injection & contact vendor, control product spec
มีนาคม 2553 ถึง พฤษภาคม 2560
Sr.Engineer
ไทยซัมซุง อิเล็คทรอนิกส์
นิคมอุตสาหกรรมเครือสหพัฒน์
สำหรับสมาชิกเท่านั้น
-Process engineer (LOB,Efficiency improvement)
- Improvement process (PI) Innovation improvement
-Logistic control container (Vessel),WH controll
-Activity and relation in department (CSR & GWP)
-Planning process production loading container
- Analyze and calculate S/T for TSE vendor.
- Vendors S/T management and improvement.
- S/T trainer for PI engineer and vendor.
- TSE KPI analysis and summary.
- TSE KPI Management, Global Evaluate Monitoring.
- Innovation Improvement, Waste eliminate in manufacturing site.
- Training Industrial Engineering to employee.
- Create activity to promote Innovation activities.
- Support new project from HQ.