Project: Leam Chabang Michelin Solar Rooftop (LMC2), Chon Buri, Thailand.
Deliverable: 1.165 MWh Solar rooftop + 7 Staircases access to roof for PV Service
Owner: Berkeley Energy Commercial Industrial Solutions (BECIS)
EPC Contractor: Moss Energy Co., Ltd.
Employer: Moss Energy Co., Ltd.– Chon Buri, Thailand.
Positions Held: Civil Designer & Project Coordinator
Responsibility:
• Conducted roof structure recalculation for additional PV module installation.
• Design working method statement for roof safety working process.
• Designed access staircase to roof and access way.
• Sub-Contractor management.
• Supervised construction activities, including both civil and electrical phases.
• Oversaw contractor management and project cost control.
• Partial assembly & Steel PEB Design.
• Lifting & Heavy transportation method design.
• Project Manpower and Budget control.
Project: S. Kij-Chai Rayong Floating solar project. Rayong, Thailand.
Deliverable: 1.771 MWh Floating Solar + 32,000 Sq.m. Pond Levelling (+10 M Water Depth.)
Owner: TotalEnengies
EPC Contractor: Moss Energy Co., Ltd.
Employer: Moss Energy Co., Ltd.– Chon Buri, Thailand.
Positions Held: Civil engineer & Head of Surveyor
Responsibility:
• Conducted method study for underwater soil excavation.
• Served as the Head of Survey for location control and underwater soil leveling processes.
• Performed dairy bathymetric survey and flood study.
• Create mapping for control dredger ship working.
• Design of working processes and construction of a dredger ship for work.
ตุลาคม 2565 ถึง มีนาคม 2566
Construction Manager
KS2 Energy Co., Ltd.
สำหรับสมาชิกเท่านั้น
Project: WBS Area A: Construction to Pre-Commissioning phase.
Greenfield and brownfield Oil and Gas project WBS Area A: Construction to Pre-Commissioning phase THAIOIL Clean Fuel Project (CFP) – Chon Buri, Thailand.
Owner: Thai Oil public company limited
PMC: Bechtel Corporation
UJV: Petrofac Southeast Asia Pte. Ltd. / Samsung Engineering (Thailand) Co., Ltd. / Saipem Singapore Pte. Ltd
EPC Contractor: Sarcon Thailand Co., Ltd.
Employer: KS2 Energy Co., Ltd.– Chon Buri, Thailand.
Positions Held: Construction Manager
Duty Period: 10/2022 – 03/2023
Responsibilities:
• Allocated work phases to subcontractors in line with budget constraints, adjusting construction plans accordingly.
• Delegated responsibilities to team sections, monitored results, and ensured effective performance.
• Developed project quality plans and managed all contract parties based on specified conditions.
• Participated in crucial meetings with clients and stakeholders,
• coordinating with relevant departments to minimize project-related issues.
• Reviewed and approved project plans conducted monthly reviews. Examined project finances and allocated funding sources.
• Oversaw subordinates to ensure fulfillment of responsibilities within defined boundaries.
• Project management on both Owner and Main-Contractor sides, focusing on construction planning and risk management.
• Monitored, controlled, and allocated work responsibilities to teams effectively.
• Participated in resolving land disputes between the project and the community villagers as part of Corporate Social Responsibility (CSR) initiatives.
• Assisted the Project Manager in stakeholder management and manipulation.
สิงหาคม 2564 ถึง กันยายน 2565
Project Coordinator & Field Manager
Stoneking Construction Co., Ltd.
สำหรับสมาชิกเท่านั้น
Project: project WBS Area E: 16 Inch NG-Line Construction phase THAIOIL Clean Fuel Project
Deliverable: 16’ Inch Diameter NG new pipeline from Area B to Area L, Length 1.6 km.
Owner: Thai Oil public company limited
PMC: Bechtel Corporation
UJV: Petrofac Southeast Asia Pte. Ltd. / Samsung Engineering (Thailand) Co., Ltd. / Saipem Singapore Pte. Ltd
EPC Contractor: Sinopec Engineering Group (Thailand) Co., Ltd.
Employer: Stoneking Construction Co., Ltd.– Chon Buri, Thailand.
Positions Held: Project Coordinator & Field Manager
Duty Period: 08/2021-09/2022
Responsibilities:
• Participated in crucial meetings with clients and stakeholders, coordinating with relevant departments to minimize project-related issues.
• Developed project quality plans and managed all contract parties based on specified conditions.
• Reviewed and approved project plans, conducted monthly reviews, and examined project finances while allocating funding sources.
• Allocated work phases to subcontractors in line with budget constraints, adjusting construction plans accordingly.
• Delegated responsibilities to team sections, monitored results, and ensured effective performance.
• Oversaw subordinates to ensure fulfillment of responsibilities within defined boundaries.
• Coordinated inspection or scanning of existing underground gas pipes and other facilities.
• Coordinated and submitted work requests and was a working permit holder.
Project: Bung-Koh-Kung KAEM LING (Monkey-Cheek) restoration project Ongkarak, Nakorn Nayok province, Thailand
Deliverable: 70 Rai (112,000 Sq.m.) Monkey-Cheek Reservoir
Owner: Bueng Ko Kung Subdistrict Administrative Organization
EPC Contractor: Songthong Service Co., Ltd.
Employer: Songthong Service Co., Ltd.– Bangkok, Thailand.
Positions Held: Project Coordinator
Duty Period: 11/2020-07/2021
Responsibilities: tabtab
•tabAllocated work phases to subcontractors in line with budget constraints, adjusting construction plans accordingly.
•tabDelegated responsibilities to team sections, monitored results, and ensured effective performance.
•tabDeveloped project quality plans and managed all contract parties based on specified conditions.
•tabParticipated in crucial meetings with clients and stakeholders,
•tabcoordinating with relevant departments to minimize project-related issues.
•tabReviewed and approved project plans conducted monthly reviews. Examined project finances and allocated funding sources.
•tabOversaw subordinates to ensure fulfillment of responsibilities within defined boundaries.
Project: Bluetech City Industrial Estate: Factory Batteries 01. Chachoengsao, Thailand.
Owner: Energy Absolute Public Company Limited. & Amita Technology (Thailand)
Consultant: 3K Solution Management Co., Ltd. & Energy Solution Management Co., Ltd.
Structural Designer: Meinhardt (Thailand)
MEP Designer: Meinhardt (Thailand)
EPC Contractor: K. Builder (Thailand) Co., Ltd.
Employer: K. Builder (Thailand) Co., Ltd.– Bangkok, Thailand.
Positions Held: Project Coordinator & Assistant Construction Manager
Duty Period: 01/2020-10/2020
Responsibilities: tabtab
•tabProject management on both Owner and Main-Contractor sides, focusing on construction planning and risk management.
•tabMonitored, controlled, and allocated work responsibilities to teams effectively.
•tabParticipated in resolving land disputes between the project and the community villagers as part of Corporate Social Responsibility (CSR) initiatives.
•tabAssisted the Construction Manager in stakeholder management and manipulation.
Project: Mine Mobility Corporation (MMC) Project. Chachoengsao, Thailand.
Factory for Car Assembly, Concrete & Steel Structure 288x100m. include Utilities, Facilities & Internal Road
Deliverable: MMC Car Assembly Building
Owner: Mine Mobility Corporation
Consultant: 3K Solution Management Co., Ltd.
Designer: VAP Co., Ltd.
EPC Contractor: K. Builder (Thailand) Co., Ltd.
Employer: K. Builder (Thailand) Co., Ltd.– Bangkok, Thailand.
Positions Held: Project Coordinator
Duty Period: 03/2020-10/2020
Responsibilities: tabtab
•tabProject management on both Owner and Main-Contractor sides, focusing on construction planning and risk management.
•tabMonitored, controlled, and allocated work responsibilities to teams effectively.
•tabParticipated in resolving land disputes between the project and the community villagers as part of Corporate Social Responsibility (CSR) initiatives.
•tabAssisted the Construction Manager in stakeholder management and manipulation.
Project: Pluak Daeng Royal Initiative Development Service Center Project (Phase 2) – Dokkrai Watchtower. (Chaloem Phrakiat Building and Dok Krai Reservoir View Tower) Rayong, Thailand.
Deliverable: Dokkrai Watchtower
Owner: Rayong Provincial Administrative Organization
Designer: Febual image Design
EPC Contractor: Major Axis Construction Co., Ltd.
Employer: Major Axis Construction Co., Ltd.– Bangkok, Thailand.
Positions Held: Project Coordinator & Civil Engineer
Duty Period: 01/2018-12/2019
Responsibilities: tabtab
•tabCollaborated effectively with subcontractors.
•tabCommunicate both Owner side and Designer side for conflict solving.
•tabManaged procurement and submitted approval requests. Planned and monitored daily work activities.
•tabEstablished and executed weekly planning.
Project: Pluak Daeng Royal Initiative Development Service Center Project (Phase 2) Rayong, Thailand.
Deliverable: 3 Building include Utilities, Facilities, and Internal Road
Owner: Rayong Provincial Administrative Organization
Designer: Febual image Design
EPC Contractor: Major Axis Construction Co., Ltd.
Employer: Major Axis Construction Co., Ltd.– Bangkok, Thailand.
Positions Held: Project Coordinator & Surveyor
Duty Period: 01/2016-12/2017
Responsibilities: tabtab
•tabDairy Documentation Record
•tabData Survey record and report
•tabEstablished and executed weekly planning for surveying.
มีใบอนุญาติประกอบวิชาชีพวิศวกรรม สาขาวิศวกรรมโยธา ระดับภาคีวิศวกร เลขที่ ภย.74431
ความสามารถอื่นๆ
- ATC + ATC C3D
- MS OFFICE + MS PROJECT
- PIC 4D SCAN
- Backhoe PC30 -320 , Truck and Heavy truck
- อุปกรณ์งานสำรวจภาคสนาม
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Publications
● Werudit K., & Sattayaprasert, W. (2023) Analysis of alternative options for constructing precast concrete roads using ELECTRE II. The 28th National Convention on Civil Engineering, 28, CEM46-1.
Conference Attendance
● The 28th National Convention on Civil Engineering (NCCE28), May 28-30, 2023
● Thailand Structural Engineering Associate (TSEA) Conference, Oct 2020
● Council of engineer: Applying technology and innovation to the development of the Thai Canal to enhance the economy, Oct 2020
Certifications and Licenses
● License of Associate Civil Engineer No. 74431
● License of Volunteer Engineer No. 10-0247
● License of TSEA Member no. 4-0558
● Motorcycle driving license No. 60001186
● Private car driving license No. 64005093
● Certifications of Safety management regarding machines that lift people to work at heights.
● Certifications of Safety management regarding scaffolding
● Certificate of Ministerial Regulations on Scaffolding and Supporting, Year 64
● Certificate for working at heights.
● Certifications of Forklift operator.
● Certifications of Safety officer supervisory level
● Certifications of Carbon steel pipe design training by TSEA
● Certifications of Training in scaffolding and bracing design concepts
● Certifications of Designed to withstand earthquakes according to Ministerial Regulation 66
● Certifications of Coping with building behavior when a fire occurs.
● Certifications of Bridge design
● THAIOIL UJV Project Management Training.
● THAIOIL UJV Basic firefighting Training.