สามารถเขียนแบบ Auto CAD
ใช้โปรแกรม Microsoft office
ใช้โปรแกรม Microsoft Project
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
-2020-2023 Improvement of Water Pipe in Rangsit – Nakhon Nayok Road
Duty : Management Construction
Owner : Provincial Eaterworks Authority
Position : Assistant Project Manager
-2019-2020 Block Valve & Facility Station of the Fifth Transmission Pipeline Project for Phase 1, EPCC and Start-up of the 14 block valve & facility stations under 5TP1
Duty : Management Construction ,QA/QC, Piping, pipeline and Steel Structure
Owner : PTT
Position : Mechanical Engineer
- 2018-2019 NPP Redundant Naphtha And PTGAS Pipeline Project
Duty : Management Construction ,QA/QC, Pipe Rack and Steel Structure
Owner : SCG
Position : Project Engineer
- 2016-2018 1st TRANSMISSION PIPELINE LIFE EXTENSION PROJECT 28 RECOAT ,
Duty : Management 2 Team Construction ,Remove Coating Gas Pipeline Line 1st
Owner : PTT
Position : Engineer
- 2015-2016 PTT Gas Pipeline For Rojana Prachinburi Industrial Park Project
Duty : Management Construction ,QA/QC ,Piping , pipeline ,Steel Structure and Control Building Gas Station
Owner : PTT
Position : Project Engineer
- 2013-2015 Schedule Of Rates Period Contract For Mains And Services At Various Locations
Duty : Management Construction ,Gas Pipeline HDPE and Estimate
Owner : PTTNGD
Position : Project Engineer
- 2012-2013 Construction Operation Platform at SCG SKV.Box culvert
Duty : Control Work Fabrication and Installation ,Steel Structure
Owner : PTTAR
Position : Site Engineer
- 2011-2012 TPP Piperack Extension Project
Duty : Control Work Fabrication and Installation ,Steel Structure
Owner : PTTCHEM
Position : Site Engineer
- 2011 Re-Installation for Isolate Valve for OTS-HAR Project
Duty : Control Work, Tie-in Install Valve
Owner : PTTNGD
Position : Site Engineer
- 2011 Project: Steel Structure Work At Samutsakorn
Duty : Control Work Fabrication and Installation ,Steel Structure
Owner : T.R.C Polypack Company Limited.
Position : Site Engineer
- 2011 Gas Compressor Bypass System Project
Duty : Control Work, Tie-in Install Valve
Owner : EGAT Company Limited
Position : Site Engineer
- 2010-2011 Fabrication and Erection New 5th Tier Steel Structure on SPRC Pipe Rack’s Section 5 TE-2739 Unit 5009 units
Duty : Control Work Fabrication and Installation ,Steel Structure
Owner : PTTAR
Position : Site Engineer
- 2009 InCyam-PTT RCS Modifucation Control Valve Project
Duty : Control Work Fabrication and Installation
Owner : PTT RCR
Position : Site Engineer
- 2006-2007 Songkhla Transmission Pipeline Project.
Duty : Control Construction & QA/QC ,Management Construction Work
Owner : PTT
Position : Site Engineer & QA/QC Engineer
- 2005-2006 Wang Noi-Kaeng Khoi Gas Pipeline Project
Duty : Control Fabrication & Installation ,Pipe Support Steel Structure Blow Down Stack Platform Fence
Owner : PTT
Position : Site Engineer