Current
1. QA Report of the following department:
- MIPT Visual PPM report
- QA Untested LRR PPM/Pareto report
- EOL Monthly Report
- Monthly Operations Meeting presentation
- MIPT Plant communication presentation
2. Follow up action for DMR at final test & Tape&Reel (Set meeting and follow up action and verify action)
3. CAB Meeting (Set meeting and update document in CAB System)
4. Ensure calibration system is effective
5. GR&R for QA and equipment and GR&R monthly report for handler.
6. Generating and publishing all QA Reports thru Tableau application (IQA report and performance by area and RBA report)
7. Support discoloration project until project success and ensure units reject are sent to FA/Reliability
8. Support UL Audit
9.Set OCAP Meeting to follow up for review OCAP procedure in each area and add thai translate.
Additional Activities
1. Follow up action of internal audit to close and verify action of Internal audit with Redempto.
2. There is an admin job in Q1'20 because QA Admin's resigned and training of Savitree (Acting QA Admin)to become effective in performing her function
3.Calibration budget Submission in Q1'20
4. Follow up all department for add that translate in a procedure that requires thai version
5.Ensure extension instrument, support onsite and out-site calibration and update calibration certificate in CalMaster system
6. Study and workshop practice at QA plant clearance
7. Orientation trainer practice
8. Kaizen submission
-Record Inspection Stamp Access Program (The 3rd Kaizen Winner)
-Change area for keep enrollment of equipment from hard copy to soft copy.
-The label identifies to use switches in the meeting room
-Support Turnkey lot ( Create Turnkey performance report, Lot on hold report, LRR/PPM report, Follow urgent lots, Check summary and feedback if found problem)
9. Control bag and an inner box of Assembly in bag damage case at IQA
10. Translate to Thai
- QA ELECTRICAL TEST OCAP 01-4001
- QA VISUAL OCAP 01-4002
- QA TAPE AND REEL CHECKLIST 18-3157
- QA BUY-OFF CHECKLIST
11.Daily monitoring: List of DMR for Validation
12.Monitor DMR in Assembly issue case at visual (Start WW45)
Follow up the action and verify action with my boss for MIPT QMS audit by Redempto.(Start : 05/28/2019)
13.Fix problem from database (access / excel)
- The missing formula in excel file at electrical
- Missing sum QTY reject in access at electrical
ประวัติการฝึกอบรม
กรกฎาคม 2555 ถึง กรกฎาคม 2555
สมาคมส่งเสริมเทคโนโลยี ไทย-ญี่ปุ่น
การสอบเทียบเครื่องมือวัดอุตสาหกรรม
สิงหาคม 2557 ถึง สิงหาคม 2557
สมาคมส่งเสริมเทคโนโลยี ไทย-ญี่ปุ่น
ฺBasic QA Circle
กันยายน 2561 ถึง กันยายน 2561
BSI Training Academy courses
ISO14001:2015 internal Audit
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 45 คำ/นาที อังกฤษ 60 คำ/นาที
รถยนต์ ,
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
The 3rd Kaizen Winner: Record Inspection Stamp Access Program