Site survey for industrial gases supply system design and cost estimation.
- Prepare bill of quantity list and based project cost.
- Bidding process.
- Prepare and approve all Project Drawing and Documents.
- Project Schedule Control and Planning.
- Basic design engineering. gases supply system ,piping, support
- System commissioning and training customer.
- Handover document As-build drawing to completely close an handover the projects.
มิถุนายน 2555 ถึง กรกฎาคม 2557
Piping Engineer
VRP ENERGY & CONSTRUCTION Co., Ltd.
T.Bangruk A.Bangburthong Nonthaburi
สำหรับสมาชิกเท่านั้น
DesignDrawing piping and support , cost estimate , All construction project within and outside
the project.The contractor. Progress and a report prepared for the project period. Handover document to
completely close project.
พฤษภาคม 2554 ถึง พฤษภาคม 2556
Field engineer
GERMAN-THAI BOILER Co., Ltd. Part ; EURO THAI ENGINEERING Co., Ltd
Drawing Isometric piping system and installation the piping. Report and update management on project
progress daily weekly report and Overseeing piping system contractors
ประวัติการฝึกอบรม
ตุลาคม 2557 ถึง มิถุนายน 2562
Linde
Transmission and filling controllers gases
ตุลาคม 2557 ถึง มิถุนายน 2562
Linde
Professional supervisor course
ตุลาคม 2557 ถึง มิถุนายน 2562
Crane Professional Co., Ltd
Crane-training
ความสามารถ
ความสามารถทางภาษา
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย 50 คำ/นาที อังกฤษ 50 คำ/นาที
รถยนต์ ,
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Project/Work ; Projects, Install N2,O2 gas supply system (Non-interrupt system) CanadianSolar Manufacturing (Thailand) Sriracha, Chonburi 4.56 Million Bath.
Project/Work ; Projects, Install N2 gas supply system Esso (Thailand) PLC ) Sriracha, Chonburi
20.1 Million Bath.
Project/Work ; Projects, Relocate and improve gases supply system for Laboratory Esso (Thailand) PLC Sriracha, Chonburi 1.2 Million Bath.
Project/Work ; Projects, Install H2 Tube Trailer supply system Kabinburi Glass RojanaIE,A.Srimahapho Prachiburi 4.42 Million Bath.
Project/Work ; Projects, Improve N2 supply system to support new additional machine Microchip Technology (Thailand) Co.,Ltd Suwintawong road, Chachoengsao (Millenium plant)
0.65 Million Bath
Project/Work ; Projects, N2 Liquid and gases supply NMB-Minebea Thai (NHT) 1 Moo 7, Chiang Rak-Noi, Bangpa-in, Ayutthaya 5.1 Million Bath
Project/Work ; Projects, Installation CO2 6T and pipe line Thongchai (Thailand) Co., Ltd Saen
Phudat, Amper Ban Pho, Cha Choengsao 1.2 Million Bath
Project/Work ; Projects, Upgrade O2 tank and improve the system Pattani O2 A.Muang, Pattani 0.8 Million Bath
Project/Work ; Projects, Install H2 & N2 supply system for 4 furnaces POS - SeAH Steel Wire Hemaraj Chonburi IE, Chonburi 2 Million Bath
Project/Work ; Projects, Installation O2,CO2 supply system and pipe line Vatana Phaisal Engineering Co., Ltd. Khao Hinsorn (Steel Structure) Prachinburi 3.2 Million Bath
Project/Work ; Projects, Improve CO2 supply system Suratthani Beverage A.Punpin, Suratthani 0.7 Million Bath
Project/Work ; Projects, Improve N2 supply system Yokohama tire.co.Ltd Amatacity rayong
2.5 Million Bath
Project/Work ; Projects, Installation O2 medical tank and pipe line Buengkarn Hospital Buengkarn 0.99 Million Bath
Project/Work ; Projects, Installation O2 medical tank and pipe line Fang Hospital Chiangmai
1 Million Bath
Project/Work ; Projects, Installation LOX supply system and pipe line PCU including master alarm system Srisangwan Hospital Mae Hong Son 1.8 Million Bath
Project/Work ; Projects, Projects, Installation LOX supply system and pipe line PCU including master alarm system Maesariang Hospital Mae Hong Son 1.15 Million Bath
Project/Work ; Projects, Install LOX. Tank ( VIE 113 T. ) ,Power Plug and Ground System University of Phayao Hospital Phayao 0.98 Million Bath
Project/Work ; Projects, Install CO2 compressing station Nakorn industrial gas Muang Nakornpanom 1.6 Million Bath
Project/Work ; Projects, N2 supply for Turnaround plant (T/A) and Cooldown Parex PTT Global
Chemical ( PTT GC # 4) rayong 0.9 Million Bath
Project/Work ; Projects, Projects, N2 supply for Turnaround plant (T/A) and Cooldown Parex SCG (ROC) rayong 1.4 Million Bath
Project/Work ; Projects, Install H30T LCO2 new tank @1unit and relocate existing tank to new plant Phanom penh gas Cambodia 1.2 Million Bath
Project/Work ; Projects, Cogeneration power plant. CP-Meiji 102 Million Bath.
Project/Work ; Projects, Cogeneration power plant. CP-BKP2 138 Million Bath.
Project/Work ; Projects, Cogeneration power plant. CP-MIN2 129 Million Bath.
Project/Work ; Projects, Cogeneration power plant. CP-NONGCHOK 155 Million Bath.
Project/Work ; Projects, ABPR2 Combined cycle cogeneration plant. Amata city chonburi 1,570 MB.
Project/Work ; Projects, BST permission and revise dwg. 20 Million Bath. Part
Project/Work ; Projects, Linde Nitrogen Plant at Sumitomo chacherngsao. 1.5 Million Bath
Project/Work ; Projects, Linde Nitrogen & Hydrogen plant at Asahi amata city 5.8 Million Bath.
Project/Work ; Projects, Linde.Install Co2 tank and Pipe line(P.U.Foam) at CP-BKP2 Saraburi 0.6 Million Bath
Project/Work ; Projects, Linde.Install Co2 tank and Pipe line(P.U.Foam) at CP-Korat 0.7 Million Bath
Project/Work ; Projects, IRPC. Repair Piping of Boiler B7801A AT UT4 Plant.
Project/Work ; Projects, IRPC. Repair Piping Shut Down 2014 (EBSM)