Job description :
1 In charge manage team for TOH operation & TOH preventive maintenance work & factory vehicles.
2 In charge and manage team for TOH preventive maintenance work.
3 Lead a team of boiler crews to preventive maintenance of TOH.
4 Responsible for engineering support of TOH and troubleshooting issues and the small and big capital projects.
5 To monitor and to ensure all worker and projects are carried out smoothly and efficiently for TOH unit.
6 To plan, implement, monitor and check on all maintenance relate matters for TOH unit.
7 To supervise work progress of boiler crew.
8 Coordinate with Purchasing Department to ensure material and goods ordered are delivered or available at time.
9 In charge daily biomass fuel consumption plan, daily biomass fuel consumption record & diesel consumption records.
Project and work responsibility :
1 Installation thermal oil heater (Boiler) to manage manpower for installation boiler and PM boiler
2 Prepare procurement documents for project boiler installation.
3 Prepare document work and plan daily, week for PM checklist and maintenance vehicles.
4 Prepare document work and plan daily, week for PM checklist of Boiler.
5 Prepare drawings for contractors to bid and check.
6 Follow up contractor work in boiler and Inspect the contractor's work after the work is delivered.
7 Manage additional project for operation and PM boiler. And manage team to fabricate and install work of various projects of department.
8 Document work of PR, PO and purchase of equipment for operation and PM boiler.
9 Follow up and manage contractor for project thermal oil piping of boiler and others project of thermal oil heater system
กันยายน 2565 ถึง กันยายน 2569
Maintenance Section Head
STEPWISE CO., LTD. and TPC OPERATION CO., LTD. (Site : Satun Green Power Plant)
Microsoft office,Excel,power point, Autocad, solid work, catia and SketchUP
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
- แผ่นดูดซับเสียงจากเส้นใยลำต้นปาล์มน้ำมัน
- Installation thermal oil heater (Boiler)
- Prepare procurement documents for project boiler installation.
- Manage manpower for installation boiler and PM boiler
- Document work of PR, PO
- Follow up contractor work in boiler.
- Manage additional project for operation and PM boiler.
- Manage document work and plan daily, week for PM checklist and maintenance vehicles.
- Manage document work and plan daily, week for PM checklist of Boiler.
- Manage team to PM Boiler.
- Manage team to PM vehicle.
- Manage team to fabricate and install work of department.
- Prepare drawings for contractors to bid and check
- Inspect the contractor's work after the work is delivered.
- Purchase of equipment for operation and PM boiler.
- ได้รับใบอนุญาตประกอบวิชาชีพวิศวกรรมควบคุม ระดับภาคีวิศวกร สาขาวิศวกรรมเครื่องกล