Check, coordinate, monitor, control and improve the work and performance of the maintenance team
Process control standard condition / Product try out
Supervise electrical, mechanical and mold department
Assess preliminary work before planning
Supervise and control the collection of work documents of the maintenance team
Take care of building improvements
Control and inspect the company's property and areas to be in a ready-to-use condition according to 5S principles
Train employees to be knowledgeable Enough for the job
Assessing repair problems for statistical purposes
Design Mold and equipment for New product
Study long-term solutions for machine repair
Planning maintenance of machinery and equipment for fixing and preventing break down of machine and production equipment to be ready for use at all times
Control and inspection of preventive maintenance, tool control, measurement and equipment testing
Design, installation of machinery and equipment, making projects, proposing budgets for the construction of machinery, tools
Management and control to meet the production department
ไม่ได้ระบุ
MACHANICAL PROJECT ENGINEER
THE PAC GROUP CO., LTD. (ON-SITE AT MICHELIN SALABURI)
สำหรับสมาชิกเท่านั้น
Plan and manage Drop mill Continuous milling project for Michelin
Work with related parties to ensure project is under control
Design the continuous milling to automate the process of milling with less human interaction (Dropping human interaction by 70% - 80%).
Up-date Production Lay-out, Drawing Set-up and up-date
Design conveyor line for add new Product
Liaise and control the contractor's work to proceed in accordance with the plan and design.
Plan operations and procure contractors
Report job status to Michelin Co. In summary and status meeting every week
Summarize reports and actions to solve customer problems for The Pac Group Co. Every week
Project budget control
Work with all departments in Michelin to achieve project goals
ไม่ได้ระบุ
PROCESS ENGINEER
VARIN FOOD MACHINERY CO., LTD.
Bangbor
สำหรับสมาชิกเท่านั้น
Lead in Quality Control in order to maximize productivity, reduce time and reduce waste
Provided training about drawing standard
Study, setup standard and R&D to assemble machines
Provided consultancy to customers in order to fix defects
Support technical solutions for customers in Thailand and other countries
Design new machine operation systems so that customers can use it conveniently and easily for maintenance.
Control the production period in accordance with the plan.
Study and design the production process of parts appropriately to reduce the production time.
Traveling to solve problems for foreign customers
SENIOR SUPERVISOR PRODUCTION & PRODUCTIVITY TEAM, MANAM STAINLESS WIRE PCL.
2010-2012, it manufactures Stainless Wire and Bar, TIG&MIG, Profile Wire
1st tier support of production line
Designed new products, process and improve machine reliability and effectiveness
Machine setup and maintenance
Planning and controlling to ensure production is live on time
Create and Design Part & Tool for support production process and QC process
Solving incident problem in factory
New Staffs Training
Design new Document for easy used and up-date to ISO doc.
Inspection new tools. Set-up machine (Try-out & improvement)
Create production planning
Study and research Problems in the production process that affects the product
Responsible and solve problems for the production head.
PROJECT ENGINEER (CONTRACT), AUTRANS (THAILAND) CO., LTD ON SITE AT GENERAL MOTOR RAYONG
2008-2008, Japanese Company/Engineer Support Automotive Manufacturing
Support Body Shop
Scope of Requirement
Simulation concept with Power Point Program
Update Schedule time line
Conceptually designed production line, Rack & Dolly
Supported and resolved production incidents
Presented prototype of concepts to owner(s) such as MINOMI / SPS
Working with an GM engineering team
Plan meetings with all customer departments
Design Jix & Fixture for Assembly Line
Hand Welding M/C Design
Line Process simulation
ASSISTANT MANAGER OF ENGINEER DEPARTMENT, TAWAN CONTAINER co., ltd.
2007-2008, Taiwan-Thai Company/Manufacturing Corrugate Sheet and Boxes process
Created drawing for order part,
Designed Jig Fixture to support production line
Controlled, Supported and maintained Waste Water System
Resolved incidents raised in Factory
Reported daily job and problem, and monthly job performance of section
Plan Preventive Maintenance machine in Factory
Create Drawing for new parts
Parts and Tools Stock Control
Prepare and Inspection parts before keep in strong or maintenance
Train and advice production staffs to use machine properly
HEAD OF MAINTENANCE DEPARTMENT, SOMPONG AND KOSHIN CO., LTD.
2005-2007, Thai & Japanese Company/ Manufacture of Engine Pump and Electronic Pump
Designed, Assembly, modified Jig Fixture to support production line
Proactively modified air piping loop, balancing with electric for cost saving
Die Casting Mold history and preventive maintenance machine plan
KAIZEN
Indication and modify air piping loop and balance phase for facility cost saving
Fork life history and maintenance
Train and advice production staffs to use machine properly
Reported daily/monthly issues/job performance of section to MD
Provided training to production staffs to use machine
SERVICE ENGINEER/TEAM LEADER, JIG SYSTEMS SERVICE CO., LTD.
2002-2005, Manufacture of Jig & Fixture, service engineer for CNC machine
Preventively monitored, maintained CNC Lathe and Machining Center
Repaired and modified parts of spindle model MH-5, MH-4, Nakamura-Tome CNC Lathe Model: TMC-15
Assembly and Jig Fixture and Inspection
Make Inspection Data for Customer
Install and alignment Jig & Fixture
Bending and setting Hydraulic piping for Jig
CNC machine installation and set-up
Create new machine for customer requirement
Production Process Control
DRAFTMAN, DESIGN 1999 CO., LTD.
1991-1994
Responsible for handed drawing
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย คำ/นาที อังกฤษ คำ/นาที
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
MAXIMIZED SPEED OF PRODUCTION
Customer Philippines, successfully setup (Filler and Seamer) and turned a new line of production, from crashed - when running with full speed - to smooth production with full speed. (1Week)
RE-SETUP SIZE OF CAN FROM SMALL TO BIGER SIZE
Customer in Myanmar, successfully re-setup size of production can from small size to bigger size. It was resulted in increasing of productivity and maximizing machines. (1 Month)
TURNED-UP MACHINE TO PRODUCE PRODUCT 150% OF CAPACITY
Customer in Vietnam, successfully turned up Machine to maximize capacity of machine from 170 cans to 260 cans per minute. (1 Month)
REDUCING 50% OF PROCESSING TIME BY RE-DESIGN PRODUCTION PROCESS
Successfully re-designed a process - following LEAN Theory and implemented it, resulted in reducing processing time from 2 days to 1 day