Supervision of the Construction of a Conduit system and Pipe jacking 1200mm.Parliamentary Project.
Supervision of the Construction of a Conduit system and Pipe Jacking 1800mm. Muang Thong Thani Project.
Supervision of the Construction of a Conduit system and Pipe Jacking 1200mm. Bang Chalong Sub Station Project.
Control the penetration of pipes through the machine Horizontal Directional Drilling (HDD) Chulalongkon soi 7
กุมภาพันธ์ 2558 ถึง พฤษภาคม 2561
Civil Inspector & Survey Inspector
Team Consulting Engineering and Management Co.,Ltd.
Construction Supervision Contractor (CSC)
Control the work of the Survey to meet the Requirements.
as Xe pian spillway, Xe namnoy spillway, Houay makchan
weir,Xe pian diversion channel, Xe namnoy diversion ,Power
Intake ,TBM, HMC & XP water transfer conduit,
Work of the Civil Inspector Control Construct Transmission
Line 500 KV form Pakse Sub station to Thailand. Foundation
132 bottom Work 6 month.
Miscellaneous building of the Xe namnoy, Xe pian , Saddle
Dam A ,Houay makchan , Power Intake , Valve Chamber
Electric Building , Diversion outlet Discharge pipe .
Resettlement Road work Ban tong Hoily, Ban Namkong.
: Control line the Building of Project.
Supervise Control Point of the Project.
Supervise Control Sub contractor to installation.
As built Document Control.
Jun10-Dec12 : Driving Sheet Pipe and Bracing work (Thailand)
Company : Thaipiling Co.,Ltd.
Position : Supervisor
Project Description: A Electric Power Station a Colony Industry Bang Pu.
Pump Bang Jak (Samutsakhon)
Suan Sunondha Rajabhat University. (Samutsongkram)
Flood Gate for Dewatering. (Om Noi)
Flood Protection. (Rangsit)
Flood Protection. (Ayutthaya)
Pomp Esso. (Pathumthani)
Ramada Hotel. (Sukhumvit15)
Activity of work : Supervise Control Sub contractor.
Planning a skill works to be Contract with Proprietor.
Planning Decide Bracing and Bridge work of Foundation.
Oct09-May10 : Government Housing Project 3200 Unit (Libya)
Company : Alekleel Construction Co.,Ltd.
Position : Surveyor
Project Description: Infra Structure System to Building a Public Utility
Sewage Strom Pipe,
Inspection Chamber, Drop Lead, Gully, Drop Shaft, Villages.
Activity of work : Supervise Control Point of the Project.
To Adjust Control Point Every Two Month.
Control a Survey Party (4 Persons)
Check line and elevation for Excavation.
Check the Profile of the System a Public Utility.
Apr08-Mar09 : Motor way Algeria Country Project (Algeria)
Company : KET Corperation Co.,Ltd.
Position : Foreman
Project Description: Construction of System High Speed Motor Way
Three Country (Morocco-Algeria-Tunisia).
Activity of work : Supervise Control Factory PC Stork Yard.
Foundation Decide Batching Plant.
Decide Temporary Road of Job Site.
Supervise Control to Build Box Culvert
(7.00*100.00*5.70m.)
Supervise Control to Build Box Culvert
(7.00*120.00*5.50M.)
Supervise Control to Build Wing Wall Inlet Outlet.
Feb07 Mar08 : Suvanrnabhumi Airport Rail Ling City Air Terminal Project. (Thailand)
Company : Sub-Contructor
Position : Supervisor
Project Description: Installation Sheet Glass Skylight, Spider Curtain Wall,
Aluminum.
Activity of work : Manage Manpower to Installation Skylight
@ Magkason Terminal
Supervise Control to Install Aluminum Frame.
Mar99 Nov04 : MRTA. Initial System Project (Thailand)
Buddamolthon 1 Road (Taling Chun Petkaseam) (Thailand)
Company : KET Engineering Co.,Ltd.
Position : Foreman
Project Description: Construction for Depot Metro Rapid Transit ,Utility.
Road Around of the Project.
Installation G.I.Pipe1000mm. Road and Bridge.
Activity of work : Control Equipment Engine for Earth Work.
Supervise Control Construction of the PC Yard.
Control the Piling Process and Construction of the
Depot slab Platform.
Supervise Control Diversion Utility of the Road.PMT 1
Supervise Foundation Construction of Road.PMT 1
Supervise Manpower Supply (NST Thailand Culture
Centre Subway)
Jan97 Mar99 : Kanjanaphisak Road Project (Mahasawat Bang Care) Thailand
Company : Krungthon Engineering Co.,Ltd.
Position : Surveyor
Project Description: Construction Road, bridge, GI.Pipe 3200mm.,2800mm.
Activity of work : Monitoring Horizontal Alignment and Vertical Alignment.
Control line and level for the Concrete Road work.
Check line and level G.I.Pipe 3200mm.,2800mm. for Pipe
Jacking pit.
Supervise all of Construction work on Site.
Control Survey Team Helper 6 Person.
Nov96 Apr 97 : Mitsubishi Factory (Nawanakhon, Thailand)
Company :PPK Construction Co.,Ltd.
Position : Foreman
Project Description: Construction Parking Lot 200000 m2.
Activity of work : To Lay Down Concrete Pipe 600mm.,1000mm.
Setting Manhole for Drainage.
Control the Pouring Concrete of the Parking Lot
Control Sub Constructor 5 Parties.
Mar96 Oct96 : Retaining wall Nakhonloung Ayudthaya (Thailand)
Company : Pramornkit Engineering Co.,Ltd.
Position : Foreman
Project Description: A Retaining wall and Public Park.
Activity of work : Supervise all of Construction Work on Site.
Control Fabrication Formwork the King Post, PC. Panel.
Document Control on Site.
Manage Manpower 35 Persons.
Jun93 Dec95 : Narathivas Rajanakarin Road Project (Thailand)
Company : STS Engineering Consultant Co.,Ltd.
Position : Surveyor Inspector
Project Description: Construction road 8 lane and Retaining wall between
Rama 3 Road to Surawong Road.
Activity of work : Supervise All the Survey Construction work.
Quality Checking Progress Repost Schedule.
Quality line and level Release Slab,Transition Slab,
Cap Beam,Cross Beam,Bridge ,Walk way.
Quality Checking Alignment and Elevation.
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย 30 คำ/นาที อังกฤษ 30 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,รถบรรทุก
รถยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Xe Pian Xe Nanoy Hydroelectric Power Project. (Laos)
ควบคุมงานให้เป็นไปตามข้อกำหนดและให้ข้อแนะนำแก่ผู้รับจ้างดูแลรับผิดชอบงานด้าน Survey Inspector ของ Team Consulting Engineering and Management.
Central Embassy Project
ควบคุมงานทางด้าน Survey รับผิดชอบผิวขอบรอบๆอาคารด้วยวัสดุต่างๆดังนี้ Façade of the Podium and Hotel, Composite Panel, Aluminum Shingle,Podium Curtain, Wall Glazing, Hotel Entrance, Fabric Canopy, Glass,Balustrade, Column Cladding, Tower Sky lobby Wall, Sky light.