1. Manage and Control overall of production to ensure all the process line are smooth working run and available
2. Manage effective Corrective and Preventive continual improvement the program
3. Yearly plan budget and manage control the production budget cost
4. Manage all production activity to be achieve target with department KPI and company OKRs
5. Development team provide technical include root cause analysis do to resolve production problem to minimize machine and production productivity loss
6. Improvement production productivity OEE tracking
7. Management operation control standard of Production procedure
8. Manage manpower and line capability
9. Support team to drive continuous improvement the productivity program
10. Project improvement system design and validation
11. Control and preparation ISO document control 9001 / 14001/18000 GMP / HACCP and document
12. Provide support EHS activities prepare and implement PPE, machine guarding, lock out / tag out and MSDS
13. Manage and evaluate to control the work job quality of subcontractor find new vendor Create Project SOW price estimate and compare BOQ, BOM and cost
ตุลาคม 2559 ถึง พฤษภาคม 2562
Sr. Utility Engineer
Cardinalhealth222
Amata City Eastate Rayong
สำหรับสมาชิกเท่านั้น
1. Maintain and overall management to ensure the buildings are in good condition and utilities machine are available and regular running in the safety function
2. Manage effective Corrective and Preventive Maintenance plan continual improvement the maintenance program
3. Yearly plan budget and manage control the maintenance budget cost
4. Manage and follow up all activity to be achieve target with department KPI and company ADP
5. Development team and provide technical analysis do to resolve Utility and production machine Problem to increase MTBF and decrease MTTR do to minimize machine and production down time
6. Maintenance and machine operation and machine optimization include provide the root cause analytical and troubleshooting of machine problem in facilities System as below
- 2400 CFM of Air Comp. (Turbo Compressor) & Air Dryer
- HVAC System such as Air Conditioning AHU/FCU Ventilation and Exhaust fan
- 600 Ton of Chiller and cooled water system
- NG Boiler and Biomass Boiler and Heat exchanger system
- NG GAS Station supply & equipment
- Cooling tower system
- Water treatment system Soft water and DI Water Supply include plumbing
- Process waste water Recycle water Plant
- Process waste water Treatment Plant
- Maintain all of Fire alarm and fire protection System
7. Maintaining and operation control standard of Waste water Quality standard law
8. Manage and control spare parts Inventory compared cost and quality of local Supplier with original supplier to make sure that the parts quality in standard and low cost
9. Project and machine Installation validation control
10. Manage team to effective within budget plan as well as deliver all the projects on time and within scope.
11. Manage and evaluate to control the work job quality of subcontractor find new vendor Create Project SOW price estimate and compare BOQ, BOM and cost
12. Support team to drive continuous improvement thru productivity program to deliver productivity project to achieve the target.
13. Creation and preparation ISO document control 9001 / 14001/18000 GMP and document for utility machine to be check and monitor machine condition as daily check sheet PM
14. Provide support EHS activities prepare and implement PPE, machine guarding, lock out / tag out and MSDS
15. Responsible and project Energy Saving program
16. Complete monthly all activities KPI report and submit to Engineering section Manager as below detail
- Production down time
- Utilities MTTR, MTBF, BD, PM complete, % machine available Corrective and Preventive action
- Headcount management time
- Maintenance Cost (spare parts / maintenance / supplier / headcount over time each.)
- Over time Control
- Energy consumption cost (Water / NG / Electricity / Recycle water / waste water / Steam)
- Project on hand update
- CI Activity
- Safety and Accident report
- QRM number of finding on hand
มีนาคม 2553 ถึง กุมภาพันธ์ 2559
Utility Engineer Level II
Essilor Optical laboratory
Amata Nakhorn Eastate Chonburi
สำหรับสมาชิกเท่านั้น
1. Maintain and overall management to ensure the buildings are in good condition and utilities machine are available and regular running in the safety function
2. Manage effective Corrective and Preventive Maintenance plan continual improvement the maintenance program
3. Yearly plan budget and manage control the maintenance budget cost
4. Manage and follow up all activity to be achieve target with department KPI and company ADP
5. Development team and provide technical analysis do to resolve Utility and production machine Problem to increase MTBF and decrease MTTR do to minimize machine and production down time
6. Maintenance and machine operation and machine optimization include provide the root cause analytical and troubleshooting of machine problem in facilities System as below
- 2400 CFM of Air Comp. (Turbo Compressor) & Air Dryer
- HVAC System such as Air Conditioning AHU/FCU Ventilation and Exhaust fan
- 600 Ton of Chiller and cooled water system
- NG Boiler and Biomass Boiler and Heat exchanger system
- NG GAS Station supply & equipment
- Cooling tower system
- Water treatment system Soft water and DI Water Supply include plumbing
- Process waste water Recycle water Plant
- Process waste water Treatment Plant
- Maintain all of Fire alarm and fire protection System
7. Maintaining and operation control standard of Waste water Quality standard law
8. Manage and control spare parts Inventory compared cost and quality of local Supplier with original supplier to make sure that the parts quality in standard and low cost
9. Project and machine Installation validation control
10. Manage team to effective within budget plan as well as deliver all the projects on time and within scope.
11. Manage and evaluate to control the work job quality of subcontractor find new vendor Create Project SOW price estimate and compare BOQ, BOM and cost
12. Support team to drive continuous improvement thru productivity program to deliver productivity project to achieve the target.
13. Creation and preparation ISO document control 9001 / 14001/18000 GMP and document for utility machine to be check and monitor machine condition as daily check sheet PM
14. Provide support EHS activities prepare and implement PPE, machine guarding, lock out / tag out and MSDS
15. Responsible and project Energy Saving program
16. Complete monthly all activities KPI report and submit to Engineering section Manager as below detail
- Production down time
- Utilities MTTR, MTBF, BD, PM complete, % machine available Corrective and Preventive action
- Headcount management time
- Maintenance Cost (spare parts / maintenance / supplier / headcount over time each.)
- Over time Control
- Energy consumption cost (Water / NG / Electricity / Recycle water / waste water / Steam)
- Project on hand update
- CI Activity
- Safety and Accident report
- QRM number of finding on hand
AGC Technoglass Thailand Co., Ltd.
Position: Senior Utility and Maintenance Engineer
Dept.: Engineering
Duration: January 2004 March, 2010
Responsibilities & Job Description
1. Maintain and Improvement machine process and utilities system to ensure the utilities and machine are available to running regular in the safety function
2. Provide technical do to improvement machine and system CM & PM (corrective and preventive maintenance)
3. Development team and provide technical analysis do to resolve Utility and production machine Problem
4. Utility and machine maintenance operation and system management control as below
- HVAC system Air Conditioning / Ventilation / Exhaust fan / Fresh air Supply / dust collector
- Chiller and cooled water system
- LPG GAS Supply Station
- Cooling tower system
- Water treatment RO & DI plant include
- Plumbing system and pump equipment
- Boiler and Heat Exchanger system
- Air Compressor with CDA system process
- Process machine plunger and core blow machine include line transfer belt conveyer and furnace
5. Implement and prepared ISO9001:2008 and 14001 document Control for Utility System
6. Implement and design the utility project system Installation and validation
7. Prepared and management control the Spare part inventory
8. Create and preparation machine inspection monthly and yearly PM Plan
9. Create and Preparation document for machine monitoring and daily condition check Complete monthly all activities 10 KPI report and submit to Maintenance Manager as below detail presentation
- Production down time
- Utilities MTTR, MTBF, Corrective and Preventive action
- Maintenance expense Cost
- Energy consumption cost (Water / GAS / waste water)
- Project on hand update and benefit
- Accident report
Responsibilities:
1. Implement corrective, preventive and predictive maintenance include resolve Machine Problem
2. Prepare and Implement Spare part for PM Follow Plan
3. Prepare Document Daily and PM Check Sheet
4. Summarize all activity and submit report to maintenance Manager
ประวัติการฝึกอบรม
มกราคม 2554 ถึง มกราคม 2554
Ministry of Energy
Personal responsibility of Energy 17-21 Jan 2011
มกราคม 2552 ถึง มกราคม 2552
Industrial Department
Boiler Operation Controller
มิถุนายน 2553 ถึง มิถุนายน 2553
Industrial Department
Waste Water Operation Controller
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 27 คำ/นาที อังกฤษ 25 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
Computor Program Design and CMMS
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
1. Maintenance management reduction cost 15 % FY-2018
2. Energy cost saving 25 KUSD/ year from the Recycling water project FY-18
3. Energy cost saving 20 KUSD/ year from the Biomass boiler operation project FY-18
4. Energy cost saving 10 KUSD/ year from the Boiler system operation project FY-17
5. Energy cost saving 10 KUSD/ year from the Air Comp. system operation project FY-17