manufacturing & process engineer, project engineer, Cost engineer
50,000บาท ขึ้นไป
24 ก.พ. 2563
24 ก.พ. 2563
ตำแหน่งที่สนใจ
manufacturing & process engineer, project engineer, Cost engineer
ประวัติการศึกษาสูงสุด
จบการศึกษาแล้ว ในปี พศ. 2550
ปริญญาตรี King Mongkut S University of Technology Thonburi ( KMUTT )
Bachelor degree
Production Engineering
3.21
ปวส. Rajamonkala Institute of Technology Nakhonrachasima.
Diploma
Machine tools
3.12
ประวัติการทำงาน
1 ปี
มกราคม 2562 ถึง กุมภาพันธ์ 2563
Manufacturing Engineering ( Seat Frame welding )
Adient & Summit cooperation Ltd
150/1-11 MOO 9, T NONGKHAM PINTHONG 2 INDUSTRAIL CHONBURI 20110
สำหรับสมาชิกเท่านั้น
1.Manufacturing Engineering ( Seat Frame welding )
Adient & Summit cooperation Ltd ( Pinthong 2 )
January 2019 Present
Lead to problem solving and analysis to fix and action problem support production GMAW ,Spot Laser welding of seat frame part.
Analysis and Improvement process Quality line balance, machine utilization etc.
New project set up and installation support new project launch and Project improvement.
Process Design and welding jig design concept for GMAW, Spot and Laser welding of Seat structure.
Machine design concept and discuss support new project and improvement project.
Process design welding for new model launch ( Ford, GM Mith).
Contractor control installation new equipment and follow up.
By off and commissioning process for new project .
Process design new line new machine and design Quality process control FMEA,PFC,. control chart Cp,Cpk,ODS,TPM etc.
Sourcing maker and evaluate cost comparison of RFQ to get optimize. Implementation standard For Manufacturing process standard (AMS ) Welding process.
Cost analysis project RFQ and process cost reducing.
Sourcing maker and evaluate cost comparison of RFQ to get optimize.
Conduct with Global project Kick off /line design /review drawing /review quality.
Project follow up to control keep target customer.
Process audit PSMC for Safety part of seat frame.
Control and maintain documentary concern quality system and AMS system.
Duties and Responsibilities
Process design new line new machine and design Quality process control FMEA,PFC,CP. control chart Cp,Cpk. New line & new machine design and installation and setup all parameter support new model and improvement line support productivity and capacity up.
Machine commissioning at supplier and follow up.
Equipment jig & Fixture concept design and tool support optimize product quality and minimize rework.
Leader core team for analysis PFMEA PFC,CP for new model launch.
Cost analysis project RFQ and process cost reducing.
Sourcing maker and evaluate cost comparison of RFQ to get optimize.
Create and design work instruction ,check sheet and set to standard.
Improvement process for Quality issue and capacity up.
New model launch process line and machine installation for Air bag line support Honda,Nissan,Toyota, Isuzu etc. Build support even customer.
Leader project decision on equipment design and make strong contribution to sourcing decisions based in quality, cost, ergonomics, safety.
Act as project and launch manager for the installations.
Implementation standard For Manufacturing process standard (MPS ) Airbag process.
Create process standard, process POKAYOKE and maintain.
Conduct with Global project Kick off /line design /review drawing /review quality.
GD&T Automobile part reading for design line and machine support new model launch and current process improvement.
Production field
Analysis quality issue solving by QC 7 tool,8D analysis, PFMEA analysis. Drive to problem solving.
Improvement process line welding(cost, quality, cycle time, volume, efficiency, etc.)
Implement PFMEA ,Standardization ,Yamasumizi chart control chart ,JBS ,AM,PM ,etc TS16949 document and audit GM. Ford .
IATF audit GD&T Automobile part reading for design line and machine support new model launch and current process improvement.
Lead 8D and A3 drive to solve problem and analysis root cause.
Create and design work instruction and maintain.
Cost reduction of process crap and process cost.
Line balance & productivity up.
Solve the problem in production line machine trouble and any trouble for production smoothing.
4.Senior Production Engineer Daikin Industries (Thailand) Co.,Ltd
Amata Nakorn Chonburi May 2008 Aug. 2015
Duties and Responsibilities :
Production field
Machine design & Inspection and Installation (Conveyor, Belt, Auto brazing (KOREA), Banding machine( Japan ), Refrigerant charge machine (Japan), Air tight test, Vacuum test etc.) and trial system at maker.
Facility support new line construction. Such as Lighting, Power supply piping ,LPG ,N2,O2, Low air , R410A,R22, AHS, High pressure pipe, Air duct, Exhaust system etc.,
Designed & install new line assembly for support production up.
Leader project decision on equipment design and make strong contribution to sourcing decisions based in quality, cost, ergonomics, safety.
Cost analysis project RFQ and process cost reducing.
Sourcing maker and evaluate cost comparison of RFQ to get optimize.
Act as project and launch manager for the installations.
Control under 4 engineer such as ,Schedule, budget and follow up and problem concern.
Management under 4 engineer and drive team.
Improvement line balance process support mix production.
Improvement assembly line and modify machine for capacity up.
Prepare equipment and production method for new product launch.
Part flow design in factory & finding new technology.
Specification making and discussion and Analysis problem with maker.
Budget setting and control for project find optimize maker & negotiation price.
Project control & assign job to member & follow up.
Leader group control and follow up assign job to member team for action plan, Job, solving problem & all concern in Group.
Problem solving in production line and analysis for take countermeasure.
New model preparation in production line and follow up, cooperation with concern department.
Contractor control project installation to follow safety, Spec requirement and on schedule.
ประวัติการฝึกอบรม
กรกฎาคม 2556 ถึง กรกฎาคม 2556
Daikin japan
Technical air conditioner and Daikin procees design manufactory
สิงหาคม 2562 ถึง สิงหาคม 2562
Thai- German institute
GD&T
พฤษภาคม 2562 ถึง พฤษภาคม 2562
Thai- German institute
SBA,SSA
ความสามารถ
ความสามารถทางภาษา
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย 20 คำ/นาที อังกฤษ 20 คำ/นาที
รถยนต์ ,
รถยนต์ ,
Auto cad,Foot ball
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Achievement : Reduce cycle time from 210 sec 180 sec support capacity up ( Profit 3 million /month ) New line assembly support over production plan up 35 sce.(Cap up 500,000 unit /year) Apply He gas for leak check process ( Save global warming , Eliminate double check, reduce process leak rework ) Reduce defect from welding process 20% to 5% Reduce retune part frame seat weld from assembly line 5% Reduce time for over change jig of welding 85 min to 5 min (double jig and rotate by motor) Implement MPS customer label process by use Fix scanner replace hand scan ( Reduce time scan 4 sec , protect wrong part 100%. Implement MPS 108 foreign object for Autoliv Air bag Thailand by RFID scan.(Protect and confirm process 100% air bag not foreign object. Reduce cycle time support customer capacity up 145 sec to 60 sec.( Auto Double torque, balance process )