- SETUP MANAFACTURING PROCESS FACILITIES TO ENSURE NEWMODEL LUNCH AND
MASS-PRODUCTION SMOOTHLY WITH GOOD PRODUCTIVITIES AND REJECT RATE.
-DESIGN PROVIDE MACHINE EQUIPMENT JIG ,TOOLING FOR NEWMODEL.
-CREATE PLANT LAY-OUT,LINE LAYOUT,PROCESS FLOW MATERAIL FLOW FOR
THE NEWMODEL.
-VERIFY AND CONTROL THE PROCESS CYCLE TIME ,OUT PUT, REJECT RATE ,
PROCESS CAPABILITIES UNTIL MASS-PRODUCTION.
-LEAD AND FOLLOW UP THE TEAM TO MAKE NEWMODEL TIMING PLAN.
-PROVIDE THE EFFICIENCY OF MANUFACTURING METHOD TO ACHIEVE THE
COMPANY TARGET AND CUSTOMER.
-DELIVER THE SUSTAINABLE MANUFACTURING STD TO PRODUCTION LINE VIA WORK
INSTRUCTION AND ALL DOCUMENTATION.
-COOPERATE WITH INTERNAL FOR QUALITY DOCUMENT GET PART APPROVAL FROM
OE CUSTOMER(PPAP&APQP AND SUPPORT DUCUMENT AS CUSTOMER'S
REQUIREMENT.
- TRY-OUT PART NEWMODEL IN JOB LASER ,BEND,GAS CUTTING AND WELD.
- MADE PART CATERPILLAR,KOMATSU,KUBOTA AND ELECTROLUX CUSTOMER
- QUALITY CONTROL NEWMODEL
- DESIGN INSPECTION CHECK SHEET OF MODEL
-DESIGN CONCEPT C/F
- SET MASTER SAMPLE PART MEAN PLASTIC INJECT,THERMOFORM,TRIMROBOT
-MADE CONTROL PLAN
-MADE WI INSPECTION
-MADE LIMIT SAMPLE UPPER-LOWER
- MADE PART COVER ROOF KUBOTA AND ISEKI CUSTOMER
มีนาคม 2552 ถึง กันยายน 2555
PRODUCTION ENGINEERING
L&E MANUFACTURING Co.,Ltd.
85/3 Soi Prachumporn Chaengwattana Road Laksi Bangkok
สำหรับสมาชิกเท่านั้น
- CONTROL PRODUCTION ON PLAN
- JOIN MEETING FOLLOW PLAN
- CHECK RAW MATERAIL USE WITH BOM BEFORE MASS PRODUCTION
- CONTROL MATERAIL IN PRODUCTION
- CHECK STOCK JOIN WITH ACCOUNTING
- SUM REPORT PRODUCTION
- CONTROL INVENTORY SUPPLIES
- REDUCE LOST TIME
- FOLLOW ACTIVITY KAIZEN INSTITUTE
ประวัติการฝึกอบรม
เมษายน 2562 ถึง เมษายน 2562
-
STAFF SAFETY IN WORK LEVEL SUPERVISOR APRIL 5,2019
มกราคม 2559 ถึง มกราคม 2559
-
BASIC BENDING AND UNFOLDING SHEET METAL JAN 7-8,2016