Engineer / Blast Furnace Department and Steel Plan Department.
For Steel Plant: Prepare refractory equipment for support making steel and others.
For Blast Furnace Plant: Making Hot metal and Pig Iron.
Control Pig Iron production and delivery product and scale also to Material yard.
Control Hot metal production and delivery product to steel plant for using be material of steel making (Billet).
Contribution steel making in part of Refractory such as invigilates condition of EAFs bricks and plan schedule repair and other part such as EBT, Center Piece.
In part of ladle, invigilate condition of Ladles bricks, preparation Ladle for using with no delay.
In part of CCM, prepare Tundish for using according to production plan.
Works and achievements:
Modified Tap hole drill by deformed bar for saving cost.
Designed Ladle cover for conservation heat of hot metal.
Produce Hot metal by using Coke rate less than 500 kg / ton-Hot metal.
The project (Reduce pin hole in billet) has been selected for the competition in India.
Be selected to kaizen study in Japan ( Karakuri kaizen 2013)
กุมภาพันธ์ 2550 ถึง พฤษภาคม 2552
Engineer
LG Electronics (Thailand) Co., Ltd.
Rayong
สำหรับสมาชิกเท่านั้น
Engineer, (Vacuum Cleaner Production)
Production Management: In charge of contacting suppliers, production planning & controlling as well as contacting marketing team to support products.
Quality Assurance: Work with vendors to assure product quality, quality control by using ILO process, developing & testing new product model and working with the service team to assure customer satisfaction and product analysis.
Cost Management: Cost control and bargaining power management.
Achievements:
Testing three vacuum cleaner models to develop a new model.
1. V-CR583STCG
2. V-CR583STCY
3. V-CR583STCG
Deliver supplies on time in every month.
Reduce waste resulting from LQC and OS&D defects.
Defect claim management