May 2019 Present ( Contract 8 Months
All Responsibility in COD
- Plan and handle for material inspection and follow installation.
- Carry out and report the performance material receiving (MRR.)
Structure survey and summarize to project engineer.
Inspect the quality of the roofing installation and inspect solar panel installation.
Inspect welds based on drawing
Inspect torque Nut and Bolt.
Find Corrective and prevention action for Improvement.
Plan and control the installation.
พฤษภาคม 2557 ถึง พฤษภาคม 2562
Construction supervisor / Safety
WMI Emporium Company Limited
Samutprakarn
สำหรับสมาชิกเท่านั้น
Plan and summarize the installation work, measure and order metal sheet.
Control the installation according to the plan. Inspection and transfer to customer.
Prepare relevant documents for construction approved.
Recommend and corrective action about installation problems.
Maintain safety on site follow Thai law. ( Safety officer technical level)
Training safety function for all staff.
All Responsibility in Marketing Department.
Develop and maintaining business relationships with customers.
Present the companys products and services for factory Industrial.
Get new customers and follow.
Manages personnel and develops sales and sales support.
Planning Delivery.
Purchasing and Cost Management.
Analytical solutions of the customer and the company.
June 2008 October 2010
Position : Logistics planning and Warehouse Leader
Company Name : PANTOS Logistics Co., Ltd.
Address : LG Electronics 192 ,M.1,Tasit , Pluakdaeng , Rayong
Logistics planning ( May 2010 - October 2010 )
- Coordinate with marketing team for the products information and transportations
Information both domestic markets and export markets.
Coordinate with Production Planning team and Quality Control team in case products have quality problems.
Planning for truck slot also container space utilization.
Coordinate with related departments for products transportation process including; booking
container loading container, container yard, documents closing and inventory control.
Prepare transportations documents including cost of transportations and related accounting issues.
Problems solving and completed jobs as assigned.
Warehouse Leader ( June 2008 April 2010 )
Control Logistics process of Air conditioner products of LG Electronics (Thailand).
Inventory Management and warehouse Management for good utilizing of the space.
Contribute the Inventory reports.
Monitor the transportation between factory and warehouse.
Manage man power schedule, job distribution and assignment, control and follow up.
Corporate with all related departments to achieve the project time frame and company goal.
Supervise, improve and support staffs to use the GERP application in effectively way.
Problems solving and completed jobs as assigned.
ประวัติการฝึกอบรม
พฤศจิกายน 2561 ถึง พฤศจิกายน 2561
ปิ่นทองกรุ๊ป
เจ้าหน้าที่ความปลอดภัย ระดับเทคนิค
พฤศจิกายน 2562 ถึง พฤศจิกายน 2562
พีแอนด์เจ
การทำงานบนที่สูง
พฤศจิกายน 2558 ถึง พฤศจิกายน 2558
ความปลอดภัยตลิ่งชัน
เจ้าหน้าที่ความปลอดภัยระดับหัวหน้างาน
ความสามารถ
ความสามารถทางภาษา
พูด (ดี) อ่าน (ดี) เขียน (ดี)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย 50 คำ/นาที อังกฤษ 50 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
Boom lift
Folks life
X lift
Drone dji
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Project : Solar PV Rooftop System 3MWp.
Customer Name : Thai Glass Industries Public Company Limited Place : Thai Glass Industries (Bang phli)
Project : Solar PV Rooftop System 1MWp.
Customer Name : Art-Serina Piston Co., Ltd.Place : 169 Soi Chalongkrung 31,Lamplatiew,
Ladkrabang,Bangkok 10520