- Control Document Sub Contractor (Daily Request / Daily Report / Request Inspection / Material Inspection /etc.)
- Send memorandum and defect list to sub Contractor.
- Inspection on site about sleeve / block out / Junction Box before pouring concrete / Installation brix with sub Contractor.
- Inspection material on site follow specification / Material approve.
- Inspection welder for testing before start work.
- Coordinate on site with sub Contractor, owner and designer team.
- Coordinate with civil team about problem on site.
- Progress Report.
- Monitor progress sub contractor for payment.
เมษายน 2560 ถึง มกราคม 2561
วิศวกร
บริษัท สุภาพรคอนสตรัคชั่น แอนด์ เซอร์วิส จำกัด Supapown Construction & Service Co., Ltd.
Estimating quantities and cost of materials, equipment and labor to determine project feasibility.
- Good understanding of safety standards and SHELL requirements.
- Plan projects progressed according to timely schedule.
- Estimating Bill of Quantities and cost of materials on site.
- Create construction readiness review's plan.
- Contractor Organization Chart & Contacts
- Staff plan
- Equipment Plan
- Training matrix & Safety passport &Certificates
- Create detailed working plan and schedule covering all critical tasks.
- Detailed Schedule high-lighted the high risk works.
- Work scopes
- Methodology/Method Statement
- Layout
- Create lifting plan and monitoring crane before use.
- Create Checklist inspector install pipe for oil.
- Create HSSE plan and commissioning plan.
- Create Innovation with worker for easy to work and contest LCSC awards. ( Shell , Thailand)
- Coordination between main-contractors and sub-contractors.
- Control quality assurance document day-to-day for activities to better efficiency.
- checking position sleeve (pipe) on site.
- Scheduling material and equipment purchases and delivery.
- Detailed inspect material of construction standards.
- Testing pressure pipe and materials to determine the leaking pipe .
- Inspection every step of construction has also gone through quality control and testing for Shell standard.
- Inspection construction drawing before start up.
- Inspection document control sub-construction before start up.
( Certificate / portfolio /document about work)
- Inspection material on site.
- Inspection shop drawing and as-built Drawing on site.
- Inspection welding for construction.
- Inspection system work.
( Electrical / Sanitary / Plumbing / etc. )
- Inspection tank install by checklist.
( information / installer / backfill / ballasting / Vacuum / tank pit / record )
- Monitoring install scaffold.
- Create request for approval (RFA) for project manager.
- Control worker and follow up progress project site.
- Monitoring about Quality, safetys knowledge on site.
- Member of Company's audit and coaching team.
- Monitoring Construction Quality Checklist for Project Managers and Contractors. ( Shell Retail Engineering )
กันยายน 2559 ถึง เมษายน 2561
วิศวกร
Kaset Thai International Sugar Corporation Public Co. Ltd , Nakhonsawan THAILAND (Sep 2015 Marc
1/1 1 ตำบล หนองโพ อำเภอตาคลี นครสวรรค์ 60140 ไทย
สำหรับสมาชิกเท่านั้น
- Monitoring design errors and make recommendations to stop their reoccurrence.
- Monitoring errors mechanical before and after extracted from sugarcane.
- Test Pressure, Vacuum and Capacity, of Evaporator, Vacuum Pan and Boiler for report to section manager.
- Test Vibration machine's motor every section for monitoring design errors and make recommendations to Maintenance and report to weekly meeting.
- Monitoring test run mechanical with Operators and report to section manager.
- Monitoring installation machine's boiler with Indian engineer.
- Monitoring test run biogas first time for KTIS.
- Monitoring fuel (bagasse / trash / biogas) before feed to boiler.
- Internal audit with section and auditor about quality control's document.
- Inspector to Contractor's work.
- Inspector to welding pipe/ roof / boiler/ conveyor belt and construction old plant and new plant in KTIS. (Liquid sucrose for coke)
- Inspector and test New Conveyor Belt. ( KTBP )
- Monitoring loss in sugar's Process by first step to last step to analysis and report.
- Report and follow up progress maintenance and start up mechanical.
- Inspect and follow up progress new plant in KTIS.
Weld / Quality /Scheduling / material / test run / report
- Control operator follow CEO and report about errors machine and problem. (Breakdown)
- Secretary at the Sugarcane Meeting for farm section. (Crushing season 59/60)