This Xayaburi Hydro Power Plant Capacity 8 unit .Unit 1-7 Supply To EGAT 1225 MW ( 1 Unit Capacity 175 MW ) Unit 8 , Capacity 60 MW Supply To EDL (Lao PDR ) Total 1,285 MW
Responsibility: Control Progress For Construction Follow Master Schedule , Coordinated and Inspection Installation as Follow Contract , Provide of piping test-loop ,and etc. Recheck System For Pre- Commissioning And Support Commissioning Team .
Detail Job Activities For Mechanical Balance Of Plant
Auxiliary Hoists , Cranes 80T&380T EOTC , Cooling Water System
Drainage and Dewatering System , Compressed Air System ,
Water Supply, Fire Fighting & Service Water System ,
Oil Purification & Transfer System , Hydraulic Oil System ,
Ventilation & Air-Conditioning System , Potable Water System ,
Wastewater Treatment System , Mechanical Workshop Equipment , Elevators
มกราคม 2558 ถึง พฤษภาคม 2559
Site Engineer
TON-NAM ENERGY LTD.,PART
LAMTAKONG JOLABHA VADHANA HYDRO POWER PLANT (UNITS 3-4) PROJECT
สำหรับสมาชิกเท่านั้น
Control Progress For Construction , Follow Master Schedule
Installation support ring , Preparing assembly and control welding stay ring and spiral case unit 3 and unit 4 ,Pressure Test Spiral Case unit 3 and unit 4 install Pit liner unit 3 and 4 , Install Embedded pipes for Turbine and hydro test unit 3 and unit 4
มิถุนายน 2557 ถึง ธันวาคม 2557
Construction Manager
CPCL CO.,LTD
สำหรับสมาชิกเท่านั้น
66 FRP Fabrication and Installation A/G
Control Progress For Construction , Follow Master Schedule , Lifting Plan As-Built Drawing , Hydro Test , Flushing , Re-Instate
Sep 2013- Dec 2014
Project : FUEL OIL FOR CHANA COMBINED CYCLE POWER PLANT
Owner : Electricity Generating Authority of Thailand (EGAT)
Employer : DEMCO PUBLIC COMPANY LIMITED
Position : Construction Manager
Responsibility: Control Progress For Construction EPC Project , Follow Master
Schedule , Coordinated and Follow up with Egat ,
Scope Off Work
- Civil Work
- Fab and Install Fuel Oil Storange Tanks 10,000 M3
( OD 34 M X 15 M) = 2 set
- Fab and Install Unloading Storange Tank 1,000 M3
( OD 15 M X 8 M) = 1 set
- Piping and Equipment Installion
- Electrical and Instrument Installation
- Pre Commissioning