- Control the work correct according to engineering principles.
- Take off material.
- Planing three week and update daily report.
- Sent to consultant for inspection.
- Describe jobs to workers and solve problems.
- Control cost of labor according to budget
- Coordinate with various partner such as M&E, Postension, Precast, etc.
- Safety in the work place
- Control the installation of fences for the work area.
- Control of land excavation work
ธันวาคม 2560 ถึง สิงหาคม 2561
Engineer
Sanki Pre Engineering Building CO.,LTD.
29/13 Mu.3 Khok Krabue Muang Samut Sakhon 74000
สำหรับสมาชิกเท่านั้น
- Change bidding drawing form To submitted drawing.
- Take off material.
- Make a shop drawing sent to the production department.
- Make a 3D with Autodesk Advance steel software.
- Make a erection drawing for installation.
- Planning project
- Coordinate with the site work and sequence of installation.
- Report progress of the installation.
- Inspect with the owner or consult for handover.
เมษายน 2557 ถึง สิงหาคม 2557
Foreman, Draftman at site work
JMS Air Engineering CO.,LTD.
Natcha Greenville Mu.3 27/113 Bang Yai - Bang Khu Rat road Bang Yai Nonthaburi 11140
สำหรับสมาชิกเท่านั้น
- Control the worker on site in accordance with the air conditioning system work.
- Clear for construction drawing form to shop drawing.
- Coordinate with various partner involved.
ประวัติการฝึกอบรม
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (ดี) เขียน (ดี)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
- AutoCAD (Good)
- Revit (Fair)
- Sketch up (Fair)
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Power Line Engineering Public Company Limited
- Pre-Cllinic Building and Research Center บางพลี (ดูแลในส่วนของอาคาร C และงานโครงหลังคาเหล็ก)
Sanki Pre Engineering Building CO.,LTD.
- Warehouse 3 project
- Steel roof truss 2 project
JMS Air Engineering CO.,LTD.
- Factory GPV-E Bangpu