1.Manage new model ducument/new product/New die
2.control operator new model inspection
3.Support customer
4.Analyze root cause of problem
5. Control new model product fromFA to mass product
6.Review and management work instruction
7.Management product when customer inform problem
8.Manage document for process line
9.Design jig for process line with program solid work
10.Make document PPAP
1. Create program for operater use machine inspection
2. Failure analysis parts dimension from customer/production
3. Control internal calibration.
4.Daily and monthly master set equipment
5. Support inspection special item
6. Verify gauge correlation ,GR&R with internal and supplier.
7. Review inspection procedures.
8. Review and management work instruction, flowchart measurement.
1. Create program for operater use machine inspection
2. Failure analysis parts dimension from customer/production
3. Control internal calibration.
4.Daily and monthly master set equipment
5. Support inspection special item
6. Verify gauge correlation ,GR&R with internal and supplier.
7. Review inspection procedures.
8. Review and management work instruction, flowchart measurement.
ประวัติการฝึกอบรม
กันยายน 2552 ถึง ตุลาคม 2552
A.P.Metrology service co.,ltd
Calyso(basic course) for tokyo semitsu 3d coordinate measuring machine model CVA 600A
เมษายน 2560 ถึง มิถุนายน 2560
quality partner
IATF 16949:2016/ISO9001:2015
มีนาคม 2559 ถึง มีนาคม 2559
Quality partner
Core tools and iso/ts 16949:2009
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (พอใช้) เขียน (พอใช้)
ไทย คำ/นาที อังกฤษ คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
-can write program Auto cad and solid work
-can write program cmm